Val Vista Grid BESS 1
209.32 MW storage in Hidalgo, TX · In queue since August 2020 · Proposed COD March 2029
209.32 MW
Capacity
1
Components
Battery
6y 3m
In Queue
Facility Study
IA Phase
Signed Dec 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5y 4m
IA → COD
3y 3m
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2029-03-30
Projected COD moved
5 times
May 2022 → Mar 2029
Net change
+82 months
first report to latest
Capacity
203 → 209 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
ERCOT Facility Study stage, IA target December 31, 2025
ercot.comResearch sources and reasoning (6 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0387/val-vista-grid-bess-1
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
- cleanview.co/power-projects/developers/eolian-energy
- ercotqueue.com/developer/val-vista-grid-llc
- ercotqueue.com/project/22INR0387
Commercial operation date: LBNL queue shows March 2029 COD. No independent news sources provide alternative dates; all aggregator sites (Cleanview, ercotqueue.com) simply mirror the LBNL filing. No press releases or financing announcements found to validate or update this target.
Developer: LBNL filing entity is 'Val Vista Grid, LLC'. No press releases, corporate announcements, or ownership disclosures found. Cleanview aggregator lists 'Eolian Energy' as associated developer for Val Vista projects, but this is unconfirmed by primary sources and may reflect a parent/affiliate relationship requiring verification.
Status: LBNL status is 'active' with Facility Study in progress and IA target of December 2025. No news coverage indicates project advancement, withdrawal, or status change. Texas PUC filings confirm project registration but provide no operational updates.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Val Vista Grid BESS 1 project is a proposed 209.32 MW battery storage project located in Hidalgo County, Texas. Developed by Val Vista Grid, LLC, the project entered the ERCOT interconnection queue on August 4, 2020, under queue ID ERCOT-22INR0387. Its proposed commercial operation date is March 30, 2029.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is at the Tap 345kV 8383 North Edinburg - 80137 Stewart Road. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hidalgo
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Val Vista Grid, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8383 North Edinburg - 80137 Stewart Road
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- NEDIN_CC1
- POI Substation
- North Edinburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.