Val Vista Grid BESS 1 (ERCOT-22INR0387) — Project Summary

Queue ID
ERCOT-22INR0387
Capacity
209.32 MW
Technology
Battery
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
Val Vista Grid, LLC
IA Status
Facility Study

Val Vista Grid BESS 1

ERCOT-22INR0387BetaActiveBatteryERCOTLBNL + Live

209.32 MW storage in Hidalgo, TX · In queue since August 2020 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

209.32 MW

Capacity

1

Components

Battery

6y 3m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

5y 4m

IA → COD

3y 3m

Total Duration

5y 4m

Construction50%
Queue EntryAug 4, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2029-03-30

Queue history
22INR0387 · 71 monthly ERCOT reports, Jul 2020 – Sep 2026

Projected COD moved

5 times

May 2022 → Mar 2029

Net change

+82 months

first report to latest

Capacity

203 → 209 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 4, 2020
Interconnection agreement signedDec 31, 2025
On ERCOT's inactive listApr 2022 – Jul 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 2029
From queue filing
Developer in saved assessment
Val Vista Grid, LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, IA pending December 2025 per LBNL; no construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedDec 31, 2025Latest in this assessment

ERCOT Facility Study stage, IA target December 31, 2025

ercot.com
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0387/val-vista-grid-bess-1
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  4. cleanview.co/power-projects/developers/eolian-energy
  5. ercotqueue.com/developer/val-vista-grid-llc
  6. ercotqueue.com/project/22INR0387

Commercial operation date: LBNL queue shows March 2029 COD. No independent news sources provide alternative dates; all aggregator sites (Cleanview, ercotqueue.com) simply mirror the LBNL filing. No press releases or financing announcements found to validate or update this target.

Developer: LBNL filing entity is 'Val Vista Grid, LLC'. No press releases, corporate announcements, or ownership disclosures found. Cleanview aggregator lists 'Eolian Energy' as associated developer for Val Vista projects, but this is unconfirmed by primary sources and may reflect a parent/affiliate relationship requiring verification.

Status: LBNL status is 'active' with Facility Study in progress and IA target of December 2025. No news coverage indicates project advancement, withdrawal, or status change. Texas PUC filings confirm project registration but provide no operational updates.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Val Vista Grid BESS 1 project is a proposed 209.32 MW battery storage project located in Hidalgo County, Texas. Developed by Val Vista Grid, LLC, the project entered the ERCOT interconnection queue on August 4, 2020, under queue ID ERCOT-22INR0387. Its proposed commercial operation date is March 30, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is at the Tap 345kV 8383 North Edinburg - 80137 Stewart Road. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Val Vista Grid, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 8383 North Edinburg - 80137 Stewart Road

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
NEDIN_CC1
POI Substation
North Edinburg Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.