Razorbill Storage (ERCOT-22INR0382) — Project Summary

Queue ID
ERCOT-22INR0382
Capacity
120 MW
Technology
Solar+Battery
Status
withdrawn
Location
Matagorda, TX
Region
ERCOT
Developer
RWE Solar Development, LLC
IA Status
Facility Study

Razorbill Storage

ERCOT-22INR0382BetaWithdrawnBatteryBatteryERCOTLBNL + Live

120 MW generation in Matagorda, TX · In queue since August 2020 · Proposed COD December 2027

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

120 MW

Capacity

1

Components

Battery

6y 3m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 4m

Queue EntryAug 4, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2027-12-15

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
22INR0382 · 63 monthly ERCOT reports, Jun 2021 – Aug 2026

Projected COD moved

3 times

Dec 2022 → Dec 2027

Net change

+60 months

first report to latest

Capacity

120 MW

unchanged in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 4, 2020
CancelledSep 14, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
RWE
Filed as RWE Solar Development, LLC
Status at research time
Active
Active — Facility Study stage, no IA executed. ERCOTqueue.com assigns 5% build-chance based on developer track record and study stage.
Financing
Not recorded

Milestones in this assessment

IA executedLatest in this assessment

No IA executed — currently in Facility Study stage

ercotqueue.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-22inr0382
  2. ercotqueue.com/project/22INR0382
  3. ercotqueue.com/developer/rwe-renewables-development-llc
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0382/razorbill-storage

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-12-15. No independent news sources or press releases found to confirm or contradict this date. One aggregator site (Cleanview) echoes 2027 but appears derivative of LBNL data.

Developer: LBNL filing entity is 'RWE Solar Development, LLC' (project-specific LLC). ERCOTqueue.com aggregates this under parent 'RWE' across 7 filing-entity LLCs with 45 total projects. RWE is the operating parent company.

Status: LBNL shows 'active' status at Facility Study stage with no IA date. Multiple aggregator sources (interconnection.fyi, ercotqueue.com) confirm active status as of April 2025. One Facebook post from April 2026 claims 'WITHDRAWN' but this appears to be an error or outdated snapshot given other sources show active.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Razorbill Storage project is a proposed 120 MW battery energy storage system in Matagorda County, Texas. It is being developed by RWE Solar Development, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0382, with a queue entry date of August 4, 2020.

The proposed commercial operation date for Razorbill Storage is December 15, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the tap 345kV 5915 STP to 44200 Hillje 345kV Ckt 64. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Solar Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 5915 STP to 44200 Hillje 345kV Ckt 64

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.