Inertia Solar (ERCOT-22INR0374) — Project Summary

Queue ID
ERCOT-22INR0374
Capacity
202.39 MW
Technology
Solar
Status
active
Location
Haskell, TX
Region
ERCOT
Developer
Inertia Solar Project, LLC
IA Status
IA Executed

Inertia Solar

ERCOT-22INR0374BetaActiveSolarERCOTLBNL + Live

202.39 MW generation in Haskell, TX · In queue since February 2021 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

202.39 MW

Capacity

1

Components

Solar

5y 9m

In Queue

IA Executed

IA Phase

Signed May 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 months

IA → COD

7y 10m

Total Duration

3 months

Construction75%
Queue EntryFeb 2, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 4, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2029-03-31

Queue history
22INR0374 · 67 monthly ERCOT reports, Oct 2020 – Sep 2026

Projected COD moved

7 times

Jul 2022 → Mar 2029

Net change

+80 months

first report to latest

Capacity

258 → 202 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 2, 2021
Interconnection agreement signedMay 10, 2023
On ERCOT's inactive listOct 2021 – Feb 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Mar 31, 2029
From queue filing
Developer in saved assessment
Inertia Solar Project, LLC
From queue filing
Status at research time
IA Executed
IA Executed — tax abatement approved by Haskell County June 2023, project remains in active queue with no construction announcements
Financing
Not recorded

Milestones in this assessment

IA executedMay 4, 2021

Interconnection Agreement executed with ERCOT

cleanview.co
Permit approvedJun 2023Latest in this assessment

Tax abatement agreement approved by Haskell County Commissioner's Court

newtools.cira.state.tx.us
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/planned-solar-projects/TX/22INR0374/inertia-solar
  2. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=1605
  3. newtools.cira.state.tx.us/upload/page/9220/Tax%20Abatement%20-%20Inertia%20Solar.pdf
  4. ercotqueue.com/project/22INR0374

Commercial operation date: LBNL queue snapshot shows proposed COD of 2029-03-31. No news or press releases found with updated COD targets; Cleanview aggregator sites echo the LBNL date. No evidence of stale data.

Developer: LBNL filing entity is 'Inertia Solar Project, LLC'. No press releases or corporate announcements found identifying a parent operating company. Texas PUC documents reference the same LLC entity. Appears to be a standalone project entity rather than a shell for a larger developer.

Status: LBNL shows 'IA Executed' status from May 2021. Texas PUC documents and Haskell County tax abatement agreement (June 2023) confirm project remains active in permitting/development phase. No groundbreaking or construction start announcements found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Inertia Solar project is a proposed 202.39 MW solar generation project located in Haskell County, Texas. The developer is Inertia Solar Project, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0374. An Interconnection Agreement (IA) was executed on May 4, 2021. The proposed commercial operation date is March 31, 2029.

The point of interconnection (POI) is at tap 345kV 60515 Clear Crossing - 6104 Smoky Hill. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Haskell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Inertia Solar Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 60515 Clear Crossing - 6104 Smoky Hill

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
AZURE_RN
POI Substation
Clear Crossing Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.