Lan Solar SLF
182.2 MW hybrid in Lamar, TX · In queue since May 2020 · Proposed COD August 2028
182.2 MW
Capacity
1
Components
Solar
6y 6m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-26
Projected COD moved
4 times
Oct 2022 → Aug 2028
Net change
+70 months
first report to latest
Capacity
182 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
No IA executed — project remains in Facility Study phase
ercotqueue.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- ercotqueue.com/project/22INR0314
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- cleanview.co/power-projects/planned/solar-farms/texas/22INR0314/lan-solar-slf
- interconnection.fyi/projects/state/TX/lamar-county
Commercial operation date: LBNL queue lists August 2028 COD. No press releases, financing announcements, or developer updates found to validate or contradict this date. Cleanview aggregator echoes the LBNL date but provides no independent source.
Developer: LBNL filing entity is 'BR Solar, LLC'. No press releases or corporate announcements found identifying a parent company or operating entity. LBL ETA workbook references 'General Solar, LLC' as an alternate name, but this appears to be a data inconsistency rather than confirmed ownership structure.
Status: LBNL status is 'active' at Facility Study stage with no IA date. No news of construction, financing, or permitting progress. ERCOTqueue's low build-chance score reflects typical attrition for early-stage projects without signed agreements.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Lan Solar SLF project is a proposed 182.2 MW solar generation project located in Lamar County, Texas. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0314, with a queue entry date of May 1, 2020. The proposed commercial operation date is August 26, 2028.
The project is currently listed as active in the interconnection queue. Recent news coverage has discussed the development project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BR Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1729 Valley South – 1692 Paris Switch
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.