Fortuna Wind (ERCOT-22INR0301) — Project Summary

Queue ID
ERCOT-22INR0301
Capacity
295.3 MW
Technology
Wind
Status
active
Location
Jack, TX
Region
ERCOT
Developer
RWE Renewables Development, LLC
IA Status
IA Executed

Fortuna Wind

ERCOT-22INR0301BetaActiveWindERCOTLBNL + Live

295.3 MW generation in Jack, TX · In queue since March 2020 · Proposed COD July 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

295.3 MW

Capacity

1

Components

Wind

6y 8m

In Queue

IA Executed

IA Phase

Signed Aug 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 5m

IA → COD

1y 11m

Total Duration

4y 5m

Schedule

5 months past proposed COD

Construction75%
Queue EntryMar 6, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 8, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-07-01

Queue history
22INR0301 · 69 monthly ERCOT reports, Jan 2021 – Sep 2026

Projected COD moved

3 times

Dec 2022 → Jul 2026

Net change

+43 months

first report to latest

Capacity

250 → 295 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 6, 2020
Facilities study approvedMay 9, 2024
Interconnection agreement signedAug 8, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jul 1, 2026
From queue filing
Developer in saved assessment
RWE Renewables
From queue filing
Status at research time
Active
Active — IA executed August 2024, interconnection approved per ERCOT capacity charts, construction timeline on track for mid-2026 COD
Financing
Not recorded

Milestones in this assessment

IA executedAug 8, 2024

Generation Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Fortuna Wind per Texas PUC filing

interchange.puc.texas.gov
COD targetJul 2026Latest in this assessment

ERCOT capacity chart confirms 295.3 MW Fortuna Wind project targeting 2026 commercial operation in Jack County

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/search/filings/?ControlNumber=35077&ItemMatch=0&SortBy=FilingParty&SortOrder=Descending&Page=1
  2. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  3. facebook.com/groups/1072789571678289/posts/1135857228704856/
  4. renewablesinfo.org/project/ercot-22inr0301-fortuna-wind

Commercial operation date: LBNL queue snapshot shows proposed COD of July 2026. ERCOT capacity chart (Result 11) confirms 2026 target year. No contradicting news sources found with more recent COD updates.

Developer: LBNL filing entity 'RWE Renewables Development, LLC' is the actual operating subsidiary of RWE Renewables (German parent). No shell-LLC structure detected; this is the legitimate development entity. No ownership changes found in search results.

Status: LBNL shows 'Active' status with IA executed 8/8/2024. ERCOT capacity chart (Result 11, Feb 2026) lists project as active with 2026 COD. Facebook post (Result 10, May 2026) mentions project is 'active' though notes interconnect approval nuances.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Fortuna Wind project is a proposed 295.3 MW wind generation facility in Jack County, Texas. The project, being developed by RWE Renewables Development, LLC, is located within the ERCOT region and interconnected to the Tap 345kV 1429 Jacksboro - 1730 WKrum point of interconnection.

The project is listed in the ERCOT interconnection queue as entry 22INR0301, with a queue entry date of March 6, 2020, and a proposed commercial operation date of July 1, 2026. The Interconnection Agreement (IA) was executed on August 8, 2024. The Fortuna Wind project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Renewables Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 1429 Jacksboro - 1730 WKrum

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Jacksboro Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.