Rockefeller Storage (ERCOT-22INR0239) — Project Summary

Queue ID
ERCOT-22INR0239
Capacity
206.8 MW
Technology
Battery
Status
active
Location
Schleicher, TX
Region
ERCOT
Developer
Mittel Rockefeller Storage LLC
IA Status
IA Executed

Rockefeller Storage

ERCOT-22INR0239BetaActiveBatteryERCOTLBNL + Live

206.8 MW storage in Schleicher, TX · In queue since October 2019 · Proposed COD June 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

206.8 MW

Capacity

1

Components

Battery

7y 1m

In Queue

IA Executed

IA Phase

Signed Sep 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 11m

IA → COD

2y 9m

Total Duration

4y 11m

Construction75%
Queue EntryOct 31, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 23, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-06-01

Queue history
22INR0239 · 75 monthly ERCOT reports, Jul 2020 – Sep 2026

Projected COD moved

4 times

Dec 2022 → Jun 2027

Net change

+54 months

first report to latest

Capacity

200 → 207 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 31, 2019
Interconnection agreement signedSep 23, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 2027
From queue filing
Developer in saved assessment
Mittel Rockefeller Storage LLC
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement signed Sept 2024, project remains in ERCOT buildout pipeline targeting 2027
Financing
Not recorded

Milestones in this assessment

IA executedSep 23, 2024

Interconnection agreement executed with ERCOT

ercot.com
COD target2027Latest in this assessment

Target commercial operation date per ERCOT buildout pipeline

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0239/rockefeller-storage
  2. ercot.com/files/docs/2025/08/08/Capacity-Changes-by-Fuel-Type-Charts_July_2025.xlsx
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  4. interconnection.fyi/projects/state/TX/schleicher-county

Commercial operation date: LBNL queue snapshot shows proposed COD of June 2027. ERCOT capacity chart (Aug 2025) confirms 2027 target. No contradicting news sources found.

Developer: Only source is LBNL filing entity 'Mittel Rockefeller Storage LLC'. No press releases or corporate announcements found to identify a parent operating company. Search results only returned unrelated Rockefeller Foundation philanthropy articles.

Status: LBNL shows IA executed on 2024-09-23. ERCOT capacity charts (Aug 2025) confirm project in active buildout pipeline with 2027 target, consistent with IA-executed status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rockefeller Storage project is a proposed 206.8 MW battery energy storage system in Schleicher County, Texas. Developed by Mittel Rockefeller Storage LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-22INR0239. The project entered the interconnection queue on October 31, 2019, and has a proposed commercial operation date of June 1, 2027.

The project's Interconnection Agreement (IA) was executed on September 23, 2024. The point of interconnection (POI) is the 76003 Big Hill 345kV substation. The Rockefeller Storage project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Schleicher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mittel Rockefeller Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

76003 Big Hill 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Big Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.