Dragan Solar (ERCOT-22INR0237) — Project Summary

Queue ID
ERCOT-22INR0237
Capacity
411 MW
Technology
Solar+Battery
Status
active
Location
Comanche, TX
Region
ERCOT
Developer
Hecate Comanche Solar LLC
IA Status
Facility Study

Dragan Solar

ERCOT-22INR0237BetaActiveSolarBatteryERCOTLBNL + Live

411 MW hybrid in Comanche, TX · In queue since November 2019 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

411 MW

Capacity

1

Components

Solar

6y 8m

In Queue

Facility Study

IA Phase

COD target: 2027

Interconnection

Total Duration

7y 10m

Facilities Study50%
Queue EntryNov 11, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

Cross-source intelligence
Beta
Medium confidence·4 sources·as of 2026-06-01
Expected COD
Aug 2027
Queue date 1–2 years staleQueue: 2027-09-15
Developer
Hecate Energy
Filed as Hecate Comanche Solar LLC
Status
Active
Active — in Facility Study phase, construction targeting 2027
Financing
Unannounced
Key milestones
COD targetAug 8, 2027Most recent

Complete date listed as 08/08/2027 in Comanche County solar projects list

source
About

The Dragan Solar project is a proposed 411 MW solar generation facility in Comanche County, Texas. The project, being developed by Hecate Comanche Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0237, with a queue entry date of November 11, 2019. The project's proposed commercial operation date is September 15, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 411 MW of solar photovoltaic generation. It is planned to connect to the grid at the 1440 Comanche 345kV point of interconnection. The Dragan Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Comanche

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Comanche Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1440 Comanche 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CPSES_UNIT1
POI Substation
Comanche Peak Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.