Velociraptor Solar I (ERCOT-22INR0218) — Project Summary

Queue ID
ERCOT-22INR0218
Capacity
251.67 MW
Technology
Solar+Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Greyhound Solar 2
IA Status
Facility Study

Velociraptor Solar I

ERCOT-22INR0218BetaActiveSolarBatteryERCOTLBNL + Live

251.67 MW hybrid in Ector, TX · In queue since May 2019 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.67 MW

Capacity

1

Components

Solar

7y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 7m

Facilities Study50%
Queue EntryMay 14, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-06-01
Expected COD
2029
From queue filing
Developer
Greyhound Solar 2
From queue filing
Status
Active
Active — Facility Study phase, no IA executed. Project has been in queue 84+ months with no public progress signals.
Financing
Unannounced
Key milestones
IA executedMost recent

No IA executed — project remains in Facility Study phase as of latest ERCOT data

source
About

Greyhound Solar 2 is a proposed 500 MW solar generation project located in Ector County, Texas. The developer is listed as Greyhound Solar 2. This project is in the ERCOT interconnection queue as entry ERCOT-22INR0218, with a queue entry date of May 14, 2019. The proposed commercial operation date is November 17, 2028. The project's interconnection agreement status is currently in the Facility Study phase.

The Greyhound Solar 2 project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Greyhound Solar 2

Utility

Entity

ERCOT

Service Type

Point of Interconnection

#10012 METEOR 5 Substation 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.