Brazos Wind Repower (ERCOT-21INR0532) — Project Summary

Queue ID
ERCOT-21INR0532
Capacity
22.4 MW
Technology
Wind
Status
active
Location
Scurry, TX
Region
ERCOT
Developer
BRAZOS WIND VENTURES, LLC
IA Status
Facility Study

Brazos Wind Repower

ERCOT-21INR0532BetaActiveWindERCOTLBNL + Live

22.4 MW generation in Scurry, TX · In queue since December 2020 · Proposed COD November 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

22.4 MW

Capacity

1

Components

Wind

5y 11m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 11m

Schedule

12 months past proposed COD

Facilities Study50%
Queue EntryDec 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-11-14

Queue history
21INR0532 · 70 monthly ERCOT reports, Dec 2020 – Sep 2026

Projected COD moved

21 times

Nov 2022 → Nov 2025

Net change

+36 months

first report to latest

Capacity

15 → 22 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 22, 2020
Facilities study approvedApr 1, 2022
Approved for energizationApr 25, 2023
Approved for synchronizationJul 1, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Brazos Wind Repower is a proposed wind generation project located in Scurry County, Texas, with a total capacity of 22.4 MW. Developed by Brazos Wind Ventures, LLC, the project consists of 22.4 MW of wind power. It is listed in the ERCOT interconnection queue as entry ERCOT-21INR0532, with a queue entry date of December 22, 2020, and a proposed commercial operation date of November 14, 2025. The project's interconnection status is currently in the Facility Study phase.

The proposed project would interconnect at the 1064 Sun 138kV point of interconnection. The Brazos Wind Repower has appeared in recent news coverage regarding renewable energy projects in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Scurry

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRAZOS WIND VENTURES, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1064 Sun 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Sun Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.