Stockyard Grid Batt
150.6 MW storage in Tarrant, TX · In queue since January 2020 · Proposed COD December 2028
150.6 MW
Capacity
1
Components
Battery
6y 10m
In Queue
IA Executed
IA Phase
Signed Oct 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 9m
IA → COD
6y 2m
Total Duration
2y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2028-12-14
Projected COD moved
10 times
May 2021 → Dec 2028
Net change
+91 months
first report to latest
Capacity
100 → 151 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Stockyard Grid, LLC
interchange.puc.texas.govERCOT capacity planning documents list 2026 as expected online date for 150.6 MW battery project
ercot.comResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025_PlannedMonthly.xlsx
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercotqueue.com/project/21INR0492
Commercial operation date: ERCOT's December 2025 capacity planning spreadsheet lists Stockyard Grid Batt with a 2026 COD, which is 2 years earlier than the LBNL queue snapshot's 2028-12-14 proposed date. This reflects updated developer timeline post-IA execution.
Developer: All sources consistently identify Stockyard Grid, LLC as both the legal entity and operating developer. No parent company or shell-LLC structure detected in any research.
Status: LBNL status of 'IA Executed' (2022-10-26) is confirmed by Texas PUC filings showing interconnection agreement between Oncor and Stockyard Grid, LLC. Project remains active in ERCOT queue with no withdrawal signals.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Stockyard Grid Batt project is a proposed 150.6 MW battery storage project located in Tarrant County, Texas. Developed by Stockyard Grid, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-21INR0492, with a queue entry date of January 13, 2020. The project's proposed commercial operation date is December 31, 2026, and its Interconnection Agreement (IA) was executed on October 26, 2022.
The proposed project's point of interconnection (POI) is at the 2082 Hicks 138kV location. The Stockyard Grid Batt project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Tarrant
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stockyard Grid, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
2082 Hicks 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CHISMGRD_RN
- POI Substation
- Hicks Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.