Stockyard Grid Batt (ERCOT-21INR0492) — Project Summary

Queue ID
ERCOT-21INR0492
Capacity
150.6 MW
Technology
Battery
Status
active
Location
Tarrant, TX
Region
ERCOT
Developer
Stockyard Grid, LLC
IA Status
IA Executed

Stockyard Grid Batt

ERCOT-21INR0492BetaActiveBatteryERCOTLBNL + Live

150.6 MW storage in Tarrant, TX · In queue since January 2020 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.6 MW

Capacity

1

Components

Battery

6y 10m

In Queue

IA Executed

IA Phase

Signed Oct 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 9m

IA → COD

6y 2m

Total Duration

2y 9m

Construction75%
Queue EntryJan 13, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 26, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-12-14

Queue history
21INR0492 · 80 monthly ERCOT reports, Feb 2020 – Sep 2026

Projected COD moved

10 times

May 2021 → Dec 2028

Net change

+91 months

first report to latest

Capacity

100 → 151 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 13, 2020
Facilities study approvedJul 14, 2022
Interconnection agreement signedOct 26, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Dec 14, 2028
Developer in saved assessment
Stockyard Grid, LLC
Sources agreed at research time
Status at research time
IA Executed
IA Executed — interconnection agreement signed with Oncor in October 2022, project remains in active development with 2026 target COD per ERCOT planning documents
Financing
Not recorded

Milestones in this assessment

IA executedOct 26, 2022

Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Stockyard Grid, LLC

interchange.puc.texas.gov
COD target2026Latest in this assessment

ERCOT capacity planning documents list 2026 as expected online date for 150.6 MW battery project

ercot.com
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025_PlannedMonthly.xlsx
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. ercotqueue.com/project/21INR0492

Commercial operation date: ERCOT's December 2025 capacity planning spreadsheet lists Stockyard Grid Batt with a 2026 COD, which is 2 years earlier than the LBNL queue snapshot's 2028-12-14 proposed date. This reflects updated developer timeline post-IA execution.

Developer: All sources consistently identify Stockyard Grid, LLC as both the legal entity and operating developer. No parent company or shell-LLC structure detected in any research.

Status: LBNL status of 'IA Executed' (2022-10-26) is confirmed by Texas PUC filings showing interconnection agreement between Oncor and Stockyard Grid, LLC. Project remains active in ERCOT queue with no withdrawal signals.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Stockyard Grid Batt project is a proposed 150.6 MW battery storage project located in Tarrant County, Texas. Developed by Stockyard Grid, LLC, the project consists entirely of battery storage. It is currently in the ERCOT interconnection queue as entry ERCOT-21INR0492, with a queue entry date of January 13, 2020. The project's proposed commercial operation date is December 31, 2026, and its Interconnection Agreement (IA) was executed on October 26, 2022.

The proposed project's point of interconnection (POI) is at the 2082 Hicks 138kV location. The Stockyard Grid Batt project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Tarrant

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Stockyard Grid, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

2082 Hicks 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CHISMGRD_RN
POI Substation
Hicks Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.