Pearl Crescent Solar
208.35 MW hybrid in Colorado, TX · In queue since May 2019 · Proposed COD December 2026
Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).
208.35 MW
Capacity
1
Components
Solar
7y 6m
In Queue
Facility Study
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Proposed COD: 2026-12-08
Project withdrew from interconnection queue
Projected COD moved
6 times
Dec 2021 → Dec 2026
Net change
+60 months
first report to latest
Capacity
208 MW
unchanged in the reports
Latest stage
Cancelled
last listed Aug 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/21INR0349/pearl-crescent-solar
- interconnection.fyi/project/ercot-21inr0349
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- ercot.com/files/docs/2020/08/21/2020_LTRA_Data_Form_TexasRE-ERCOT_Final_8-4-2020.xlsx
- ercotqueue.com/developer/rwe
- ercotqueue.com/project/21INR0349
Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-12-08. No independent news sources or press releases found to validate or contradict this date; all search results merely echo LBNL/ERCOT queue data.
Developer: LBNL filing entity is 'RWE Solar Development, LLC' (project-specific LLC). Parent operating company is RWE, a major German utility with substantial U.S. renewables portfolio.
Status: LBNL status is 'active' at Facility Study stage. No news coverage found indicating construction start, financing close, or withdrawal. Project appears to be progressing through interconnection studies without public milestones.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Pearl Crescent Solar project is a proposed 208.35 MW solar generation facility in Colorado County, Texas. Developed by RWE Solar Development, LLC, the project consists of 208.35 MW of solar photovoltaic generation.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-21INR0349, with a queue entry date of May 31, 2019. Its proposed commercial operation date is December 8, 2026, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Rock Island (57640) 138kV substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Aug 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Colorado
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Solar Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Rock Island (57640) 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Crescent
Data-driven briefing on Crescent — fleet, generation, financial, and news signals.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Pearl Crescent Solar
Data-driven briefing on Pearl Crescent Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.