Nightfall Solar (ERCOT-21INR0334) — Project Summary

Queue ID
ERCOT-21INR0334
Capacity
180.87 MW
Technology
Solar
Status
active
Location
Uvalde, TX
Region
ERCOT
Developer
BDPU SOLAR NIGHTFALL, LLC
IA Status
IA Executed

Nightfall Solar

ERCOT-21INR0334BetaActiveSolarERCOTLBNL + Live

180.87 MW generation in Uvalde, TX · In queue since May 2019 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

180.87 MW

Capacity

1

Components

Solar

7y 6m

In Queue

IA Executed

IA Phase

Signed Oct 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 5m

IA → COD

3y 2m

Total Duration

4y 5m

Construction75%
Queue EntryMay 10, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 26, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-12-31

Queue history
21INR0334 · 80 monthly ERCOT reports, Jan 2020 – Sep 2026

Projected COD moved

6 times

Apr 2022 → Dec 2026

Net change

+56 months

first report to latest

Capacity

152 → 181 MW

changed in the reports

Latest stage

Energized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 10, 2019
Facilities study approvedDec 17, 2025
Interconnection agreement signedOct 26, 2023
Approved for energizationSep 22, 2026
On ERCOT's inactive listOct 2022 – Oct 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2026
Developer in saved assessment
Sol Systems
Filed as BDPU SOLAR NIGHTFALL, LLC
Status at research time
Active
Active — financial close achieved March 2026, construction phase with 2026 COD target
Financing
Secured
$334 million financing closed March 2026, announced by Sol Systems

Milestones in this assessment

IA executedOct 26, 2023

Interconnection Agreement executed with ERCOT

finance.yahoo.com
COD target2026

Expected commercial operation in 2026

cleanview.co
Financing closeMar 2026Latest in this assessment

Financial close for 180 MW-ac Nightfall Solar Project, $334 million investment

solsystems.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. finance.yahoo.com/news/sol-systems-advances-national-clean-120000824.html
  2. solsystems.com/news/sol-systems-advances-national-clean-energy-portfolio-with-financial-close-of-blossom-solar-project-in-ohio-and-announcement-of-nightfall-solar-project-in-texas/
  3. nightfallsolar.com/
  4. cleanview.co/power-projects/planned/solar-farms/texas/21INR0334/nightfall-solar
  5. abeienergy.com/en/proyectos/nightfall-solar/

Commercial operation date: LBNL proposed COD of 2026-11-30 aligns with Sol Systems' March 2026 announcement stating the project reached financial close and multiple sources (Cleanview, project website) confirming 2026 expected online date.

Developer: LBNL filing entity 'BDPU SOLAR NIGHTFALL, LLC' is a project-specific shell. Sol Systems announced financial close in March 2026 and operates the project website, confirming them as the actual developer/owner.

Status: LBNL status 'active' with IA executed (Oct 2023) is accurate. Sol Systems announced financial close in March 2026 for this $334M project, indicating active development toward 2026 commercial operation.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Nightfall Solar SLF is a proposed solar generation project located in Uvalde County, Texas, with a total capacity of 181.16 MW. The project is being developed by BDPU SOLAR NIGHTFALL, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-21INR0334, with a queue entry date of May 10, 2019, and a proposed commercial operation date of November 30, 2026.

The project's interconnection agreement was executed on October 26, 2023. The point of interconnection is Tap 138kV 8241 Razorback - 8234 Uvalde.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Uvalde

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BDPU SOLAR NIGHTFALL, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

138 kV Tap 8707 Dryfrio - 8234 Uvalde (new 138 kV Meil station)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HELIOS_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.