Nightfall Solar
180.87 MW generation in Uvalde, TX · In queue since May 2019 · Proposed COD December 2026
180.87 MW
Capacity
1
Components
Solar
7y 6m
In Queue
IA Executed
IA Phase
Signed Oct 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 5m
IA → COD
3y 2m
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2026-12-31
Projected COD moved
6 times
Apr 2022 → Dec 2026
Net change
+56 months
first report to latest
Capacity
152 → 181 MW
changed in the reports
Latest stage
Energized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Financial close for 180 MW-ac Nightfall Solar Project, $334 million investment
solsystems.comResearch sources and reasoning (5 recorded sources)
high confidence at research time
- finance.yahoo.com/news/sol-systems-advances-national-clean-120000824.html
- solsystems.com/news/sol-systems-advances-national-clean-energy-portfolio-with-financial-close-of-blossom-solar-project-in-ohio-and-announcement-of-nightfall-solar-project-in-texas/
- nightfallsolar.com/
- cleanview.co/power-projects/planned/solar-farms/texas/21INR0334/nightfall-solar
- abeienergy.com/en/proyectos/nightfall-solar/
Commercial operation date: LBNL proposed COD of 2026-11-30 aligns with Sol Systems' March 2026 announcement stating the project reached financial close and multiple sources (Cleanview, project website) confirming 2026 expected online date.
Developer: LBNL filing entity 'BDPU SOLAR NIGHTFALL, LLC' is a project-specific shell. Sol Systems announced financial close in March 2026 and operates the project website, confirming them as the actual developer/owner.
Status: LBNL status 'active' with IA executed (Oct 2023) is accurate. Sol Systems announced financial close in March 2026 for this $334M project, indicating active development toward 2026 commercial operation.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Nightfall Solar SLF is a proposed solar generation project located in Uvalde County, Texas, with a total capacity of 181.16 MW. The project is being developed by BDPU SOLAR NIGHTFALL, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-21INR0334, with a queue entry date of May 10, 2019, and a proposed commercial operation date of November 30, 2026.
The project's interconnection agreement was executed on October 26, 2023. The point of interconnection is Tap 138kV 8241 Razorback - 8234 Uvalde.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Uvalde
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BDPU SOLAR NIGHTFALL, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Tap 8707 Dryfrio - 8234 Uvalde (new 138 kV Meil station)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HELIOS_RN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
What's the status of the 1 queue project linked to Nightfall Solar?
Data-driven briefing on Nightfall Solar — fleet, generation, financial, and news signals.
Nightfall Solar
Data-driven briefing on Nightfall Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.