Dove Run Solar
120.86 MW generation in Duval, TX · In queue since May 2019 · Proposed COD October 2027
120.86 MW
Capacity
1
Components
Solar
7y 6m
In Queue
IA Executed
IA Phase
Signed Oct 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 5m
IA → COD
4 years
Total Duration
4y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2027-10-15
Projected COD moved
5 times
Dec 2021 → Oct 2027
Net change
+70 months
first report to latest
Capacity
101 → 121 MW
changed in the reports
Latest stage
IA signed
last listed Apr 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Duval County tax abatement agreement finalized for $148M project
co.duval.tx.usProposed commercial operation date per ERCOT queue
caller.comResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- caller.com/story/news/local/2022/10/24/two-major-renewable-energy-projects-coming-to-duval-county/69569571007/
- co.duval.tx.us/upload/page/11362/20240612_Dove%20Run-Attachment%20to%20Application.pdf
- co.duval.tx.us/upload/page/11362/20241010_Duval%20County%20Tax%20Abatement%20with%20Dove%20Run%20Solar%20Project%202024-10-07.pdf
Commercial operation date: LBNL queue shows proposed COD of 2027-10-15. October 2022 Corpus Christi Caller-Times reported construction expected to begin in 2023, but no updated COD target found in recent sources. LBNL date appears reasonable given IA execution in Oct 2023.
Developer: LBNL filing entity is 'Dove Run Solar Project, LLC' (project-specific Delaware LLC per tax abatement docs). Corpus Christi Caller-Times Oct 2022 identifies 'Savion Renewal Energy' as the developer expecting to begin construction. Savion is the operating company; Dove Run Solar Project LLC is the project vehicle.
Status: LBNL status is 'active' with IA executed Oct 2023. County tax abatement agreement dated Oct 2024 confirms project remains active. Original 2022 news indicated 2023 construction start, but no groundbreaking announcements found, suggesting schedule slip.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dove Run Solar is a proposed 120.86 MW solar photovoltaic generation project located in Duval County, Texas. The development project is being pursued by Dove Run Solar Project, LLC, and is planned to interconnect to the Electric Reliability Council of Texas (ERCOT) grid. Its proposed point of interconnection is a tap on the 138 kV transmission line between the Falfurrias (8510) and Crestonio (8695) substations.
The project entered the ERCOT interconnection queue on May 7, 2019, under queue ID ERCOT-21INR0326. An interconnection agreement was executed on October 31, 2023, and the project's proposed commercial operation date is October 15, 2027. Despite the executed agreement, the project's current status in the queue is listed as suspended.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Apr 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Duval
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Dove Run Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 8510 Falfurrias - 8695 Crestonio
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- FALFUR_RN
- POI Substation
- Falfurrias Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.