Mountaineer Solar (ERCOT-21INR0294) — Project Summary

Queue ID
ERCOT-21INR0294
Capacity
332.1 MW
Technology
Solar
Status
active
Location
Brown, TX
Region
ERCOT
Developer
Mustang Mountaineer Solar LLC
IA Status
Facility Study

Mountaineer Solar

ERCOT-21INR0294BetaActiveSolarERCOTLBNL + Live

332.1 MW generation in Brown, TX · In queue since April 2019 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

332.1 MW

Capacity

1

Components

Solar

7y 7m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 5m

Facilities Study50%
Queue EntryApr 16, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-01

Queue history
21INR0294 · 82 monthly ERCOT reports, Dec 2019 – Sep 2026

Projected COD moved

13 times

Dec 2021 → Sep 2029

Net change

+93 months

first report to latest

Capacity

332 → 329 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 16, 2019
Facilities study approvedMar 22, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 1, 2029
From queue filing
Developer in saved assessment
Mustang Mountaineer Solar LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no executed IA; no public construction, permitting or financing activity found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-21inr0294
  2. cleanview.co/power-projects/planned/solar-farms/texas/21INR0294/mountaineer-solar
  3. ercotqueue.com/project/21INR0294
  4. interxdata.com/projects/mountaineer-solar-ercot-gis-report-21inr0294/
  5. opencorporates.com/companies/us_tx/0803321288

Commercial operation date: Only the LBNL/ERCOT queue date (2029-09-01) is available. interconnection.fyi repeats it as 'The proposed completion date is September 1, 2029' and Cleanview says 'Expected online 2029', but both appear to derive from the queue data, so they are not independent confirmation. No developer press release or news gives a financing-backed target.

Developer: Every source that names a developer (ERCOT queue trackers, Texas corporate registries) gives the filing LLC, Mustang Mountaineer Solar LLC. No press release or news identifies a parent or operating company, so I did not infer one.

Status: LBNL, interconnection.fyi and ercotqueue.com all show the project as active with no IA (ercotqueue.com gives a 13% build-chance). interxdata.com calls it 'operational', but that conflicts with the other sources and the 2029 proposed COD, so I treated it as a data error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mountaineer Solar is a proposed solar generation project located in Brown County, Texas, with a total capacity of 329.64 MW. The project, developed by Mustang Mountaineer Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-21INR0294, with a queue entry date of April 16, 2019. The proposed commercial operation date is November 1, 2028, and the project's interconnection agreement status is currently Facility Study.

The Mountaineer Solar project has been the subject of recent news coverage, with nine articles appearing in industry, grid, and deals publications.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brown

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mustang Mountaineer Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1444 Brown 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BBSES_UNIT1
POI Substation
Big Brown Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.