Eastbell Milam Solar
244.86 MW generation in Milam, TX · In queue since October 2018 · Proposed COD November 2026
244.86 MW
Capacity
1
Components
Solar
8y 1m
In Queue
IA Executed
IA Phase
Signed Sep 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 11m
IA → COD
4y 2m
Total Duration
3y 11m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 12–24 months
Proposed COD: 2026-11-01
Projected COD moved
24 times
Dec 2021 → Nov 2026
Net change
+59 months
first report to latest
Capacity
201 → 245 MW
changed in the reports
Latest stage
Synchronized
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Expected online date per LBNL queue and third-party tracking
cleanview.coResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/solar-farms/texas/21INR0203/eastbell-milam-solar-
- interconnection.fyi/project/ercot-21inr0203
- ercotqueue.com/developer/edp-renewables
- interchange.puc.texas.gov/Documents/56969_24_1434139.PDF
Commercial operation date: LBNL proposed COD of October 2025 is the only explicit date available. Search results confirm project is 'planned' and 'expected online 2025' but provide no contradictory target date. One source (ercotqueue.com) lists status as 'Commissioned' which conflicts with LBNL's 'active' status, but provides no alternative COD.
Developer: LBNL filing entity 'EDP RENEWABLES NORTH AMERICA LLC' matches the operating company name consistently used across all search results. No shell LLC or project-specific entity detected; this appears to be direct ownership by the parent company.
Status: LBNL shows 'active' with IA executed September 2022. Ercotqueue.com claims 'Commissioned, 100%' but this contradicts all other sources showing 2025 expected online date and no operational evidence. LBNL status is more reliable.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Eastbell Milam Solar project is a proposed 244.86 MW solar generation project located in Milam County, Texas. The developer is EDP Renewables North America LLC. The project is in the ERCOT interconnection queue as entry ERCOT-21INR0203, with a queue entry date of October 10, 2018, and a proposed commercial operation date of October 31, 2025.
The project's Interconnection Agreement (IA) has been executed as of September 2, 2022. The point of interconnection (POI) is the 345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2. The project is currently listed as active in the interconnection queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
EDP RENEWABLES NORTH AMERICA LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Eastbell Milam Solar
Data-driven briefing on Eastbell Milam Solar — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
EDPR Scarlet III
Data-driven briefing on EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.