Red Holly Storage

ERCOT-21INR0033BetaActiveBatteryBatteryERCOTLBNL + Live

50 MW generation in Dawson, TX · In queue since September 2018 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

50 MW

Capacity

1

Components

Battery

8y 2m

In Queue

IA Executed

IA Phase

Signed Oct 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 1m

IA → COD

7y 7m

Total Duration

2y 1m

Construction75%
Queue EntrySep 27, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 19, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-05-30

Queue history
21INR0033 · 94 monthly ERCOT reports, Dec 2018 – Sep 2026

Projected COD moved

5 times

Jul 2021 → May 2028

Net change

+82 months

first report to latest

Capacity

50 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 27, 2018
Facilities study approvedApr 2, 2020
Interconnection agreement signedOct 19, 2020

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonedevelopment agreement and zoning approvalGalveston County Daily News · 2025-08-07
Delay reasonpermittingKTEN · 2025-09-18
Project lifecycle
as of 2025-08-07
PhaseConstructionGalveston County Daily News · 2025-08-07
OperationalNoGalveston County Daily News · 2025-08-07
TechnologyBatteryGalveston County Daily News · 2025-08-07
DeveloperSpearmint EnergyGalveston County Daily News · 2025-08-07
Permit decisionGrantedGalveston County Daily News · 2025-08-07

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Red Holly Storage is a proposed 50 MW battery storage project located in Dawson County, Texas. Developed by GreenGo Energy, the project is interconnected within the ERCOT region under queue ID ERCOT-21INR0033. The project entered the interconnection queue on September 27, 2018, and has a proposed commercial operation date of May 30, 2028. The Interconnection Agreement (IA) for the project was executed on October 19, 2020.

The project consists of 50 MW of battery storage capacity. The point of interconnection (POI) is at the tap 345kV 59900 Longdraw - 79641 Farmland. The Red Holly Storage project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Dawson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GreenGo Energy

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 59900 Longdraw - 79641 Farmland

Data Source

LBNL + Live

DeveloperEngie±KTEN · 2025-09-18
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.