Renegade Project (ERCOT-20INR0255) — Project Summary

Queue ID
ERCOT-20INR0255
Capacity
515.66 MW
Technology
Solar
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
Renegade Renewable LLC
IA Status
IA Executed

Renegade Project

ERCOT-20INR0255BetaActiveSolarERCOTLBNL + Live

515.66 MW generation in Deaf Smith, TX · In queue since February 2019 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

515.66 MW

Capacity

1

Components

Solar

7y 9m

In Queue

IA Executed

IA Phase

Signed Jan 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 11m

IA → COD

7 years

Total Duration

1y 11m

Construction75%
Queue EntryFeb 26, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 4, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-01-15

Queue history
20INR0255 · 92 monthly ERCOT reports, Feb 2019 – Sep 2026

Projected COD moved

11 times

Dec 2021 → Jan 2028

Net change

+73 months

first report to latest

Capacity

514 → 516 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 26, 2019
Facilities study approvedDec 7, 2020
Interconnection agreement signedJan 4, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: Jan 15, 2028
Developer in saved assessment
TNX Holdings
Ownership change in saved research
Status at research time
IA Executed
Active in the ERCOT queue with an IA executed Jan 2021. Global Energy Monitor lists the project as pre-construction, and no construction start has been confirmed.
Financing
Not recorded
Ownership history
  1. —·Blue Planet→TNX Holdingsinfrasure.ai

Milestones in this assessment

IA executedJan 4, 2021

Interconnection Agreement executed for the 515.66 MW Renegade Project.

infrasure.ai
COD targetApr 17, 2027Latest in this assessment

Proposed COD of April 17, 2027, ahead of the LBNL date of 2028-01-15.

infrasure.ai
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. infrasure.ai/project/ercot-20inr0255-renegade-project
  2. interconnection.fyi/eia/plant/65310
  3. cleanview.co/power-projects/planned/solar-farms/texas/20INR0255/renegade-project
  4. gem.wiki/Renegade_Solar_Project
  5. tnx.com/project_list/index_files/renegade.php
  6. ercotqueue.com/project/20INR0255

Commercial operation date: Three post-LBNL aggregator sources put completion in 2027: infrasure lists a proposed COD of 2027-04-17, the EIA-based interconnection.fyi page lists December 1, 2027, and cleanview says 'Expected online 2027'. LBNL still shows 2028-01-15. The sources agree on the year but not the exact date, so only the year is reported.

Developer: The infrasure project page shows a Blue Planet → TNX Holdings ownership link. The tnx.com project page lists Renegade Renewable, LLC as its project entity and says the project was 'originally developed by Blue Planet'. The transfer date is not given.

Status: LBNL shows an active queue entry with an executed IA, and infrasure confirms the IA was signed Jan 4, 2021. Global Energy Monitor says pre-construction, which conflicts with ercotqueue.com's 'Construction' label. I did not treat that label as reliable.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Renegade Project is a proposed 515.66 MW solar generation project located in Deaf Smith County, Texas. Developed by Renegade Renewable LLC, the project consists of 515.66 MW of solar photovoltaic generation. The project is interconnected within the ERCOT queue as entry ERCOT-20INR0255, with a queue entry date of February 26, 2019. The proposed commercial operation date is April 17, 2027, and an Interconnection Agreement (IA) was executed on January 4, 2021.

The proposed project is linked to the existing Renegade Solar Project (Dawn) operating plant (EIA ID 65310). Recent news coverage has discussed the project, with articles categorized as relating to the grid and hazards.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Renegade Renewable LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 23910 Windmill - 23906 AJ Swope

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.