Impala Flats Wind
282 MW generation in Lynn, TX · In queue since January 2019 · Proposed COD June 2026
282 MW
Capacity
1
Components
Wind
7y 10m
In Queue
Facility Study
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 5m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-03
Projected COD moved
5 times
Nov 2020 → Jun 2026
Net change
+67 months
first report to latest
Capacity
282 MW
unchanged in the reports
Latest stage
Cancelled
last listed Jun 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- ercotqueue.com/project/20INR0233
- ercotqueue.com/developer/antelope-flats-wind-llc
- cleanview.co/power-projects/planned/wind-farms/texas/20INR0233/impala-flats-wind-
- interconnection.fyi/project/ercot-20inr0233
Commercial operation date: LBNL queue snapshot shows proposed COD of 2026-06-03. Multiple aggregator sites (Cleanview, interconnection.fyi, ercotqueue.com) echo this June 2026 date, but no independent press releases or developer announcements confirm it. The date appears to be solely derived from LBNL filings.
Developer: LBNL filing entity is 'Antelope Flats Wind, LLC', a project-specific LLC. No press releases, corporate announcements, or news coverage identify the parent operating company. Search results include no developer attribution beyond the shell LLC name.
Status: LBNL reports 'active' status at Facility Study stage with no IA executed. Ercotqueue.com confirms 'No IA' status and assigns low 5% build-chance score, consistent with early-stage projects that have not progressed to interconnection agreement.
About
Generated Apr 10, 2026 · Predates Jun 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Impala Flats Wind is a proposed 282 MW wind generation project located in Lynn County, Texas. The developer is Antelope Flats Wind, LLC. The project is in the ERCOT interconnection queue as entry ERCOT-20INR0233, with a queue entry date of January 11, 2019. The proposed commercial operation date is June 3, 2026, and the interconnection agreement status is currently Facility Study. The project has been mentioned in recent industry news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jun 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Lynn
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Antelope Flats Wind, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
79641 Farmland 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Impala Flats Wind
Data-driven briefing on Impala Flats Wind — fleet, generation, financial, and news signals.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.