Peyton Creek Wind II (ERCOT-20INR0155) — Project Summary

Queue ID
ERCOT-20INR0155
Capacity
241.2 MW
Technology
Wind
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
RWE Renewables Development, LLC
IA Status
IA Executed

Peyton Creek Wind II

ERCOT-20INR0155BetaActiveWindERCOTLBNL + Live

241.2 MW generation in Matagorda, TX · In queue since August 2018 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

241.2 MW

Capacity

1

Components

Wind

8y 3m

In Queue

IA Executed

IA Phase

Signed Feb 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 6m

IA → COD

3y 10m

Total Duration

4y 6m

Construction75%
Queue EntryAug 21, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 27, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-12-31

Queue history
20INR0155 · 93 monthly ERCOT reports, Jan 2019 – Sep 2026

Projected COD moved

11 times

Dec 2020 → Dec 2026

Net change

+72 months

first report to latest

Capacity

202 → 241 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 21, 2018
Facilities study approvedJun 25, 2024
Interconnection agreement signedApr 29, 2026
Approved for energizationDec 30, 2024
Approved for synchronizationFeb 5, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalpv magazine USA · 2026-03-09
Latest milestonebuild phase complete, entering final commissioning · 2026Energies Media · 2026-03-26

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2025
Differs from queue: Dec 31, 2026
Developer in saved assessment
RWE Renewables
Sources agreed at research time
Status at research time
Online
Online — commissioned in 2025 as part of RWE's 2 GW US expansion, confirmed operational by March 2026
Financing
Secured
15-year physical PPA with Microsoft Corporation signed May 2024 for 446 MW across RWE Texas portfolio (includes this project)

Milestones in this assessment

IA executedFeb 27, 2023

Interconnection Agreement executed with ERCOT

interconnection.fyi
Financing closeMay 2024

15-year physical PPA signed with Microsoft for 446 MW Texas wind portfolio

windinsider.com
COD target2025Latest in this assessment

Project achieved commercial operation as part of RWE's 2 GW US commissioning in 2025

rwe.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. rwe.com/en/press/rwe-americas/2026-03-05-rwe-commissions-2-gw-of-new-energy-projects-in-the-us/
  2. baycitytribune.com/news/rwe-brings-wind-power-to-matagorda-county-as-grid-demand-climbs/article_aca6953d-9872-4795-9ad0-68285ad8d0c9.html
  3. pv-magazine-usa.com/2026/03/06/rwe-americas-touts-2-gw-of-clean-energy-projects-commissioned-in-2025/
  4. windinsider.com/2024/05/25/rwe-inks-15-year-ppa-with-microsoft-for-446-mw-onshore-wind-energy-for-texas/
  5. energy-storage.news/rwe-brings-online-four-bess-projects-in-13gw-us-clean-energy-portfolio/

Commercial operation date: LBNL proposed COD was Feb 2026, but multiple March 2026 press releases from RWE and trade publications confirm the project came online in 2025 as part of RWE's 2 GW commissioning wave. The Bay City Tribune specifically mentions 'a 243-megawatt wind project' in Matagorda County brought online in 2025, matching this project's specs.

Developer: LBNL filing entity 'RWE Renewables Development, LLC' is the actual operating subsidiary, not a shell LLC. All news sources consistently refer to RWE or RWE Renewables as the developer and operator.

Status: Multiple independent sources from March 2026 (RWE press release, pv magazine, Energy-Storage.News, Bay City Tribune) confirm the project achieved commercial operation in 2025, updating the LBNL 'active' status to operational.

Project lifecycle
as of 2026-03-26
PhaseConstructionEnergies Media · 2026-03-26
OperationalNoEnergies Media · 2026-03-26
Technologyoffshore_windEnergies Media · 2026-03-26
DeveloperVineyard WindEnergies Media · 2026-03-26
GroundbreakingAnnouncedEnergies Media · 2026-03-26
DelayAnnouncedEnergies Media · 2026-03-26

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Peyton Creek Wind II project is a 241.2 MW wind generation facility in Matagorda County, Texas. The developer is RWE Renewables Development, LLC. The project is interconnected to the ERCOT grid under queue ID ERCOT-20INR0155, with an interconnection queue entry date of August 21, 2018, and a proposed commercial operation date of February 28, 2026. The Interconnection Agreement (IA) was executed on February 27, 2023.

The project is linked to the existing Peyton Creek Wind Farm II operating plant (EIA plant ID 67700). The Peyton Creek Wind II project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Renewables Development, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

42400 Refuge 345kV

Data Source

LBNL + Live

DeveloperRWEWindInsider · 2024-05-25
TransactionPPAWindInsider · 2024-05-25
OfftakerMicrosoft CorporationWindInsider · 2024-05-25
PPA structurePhysicalWindInsider · 2024-05-25
PPA term15 yearsWindInsider · 2024-05-25
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-04-09