Tri-X Solar 1 SLF (ERCOT-20INR0143) — Project Summary

Queue ID
ERCOT-20INR0143
Capacity
201.5 MW
Technology
Solar+Battery
Status
active
Location
Crane, TX
Region
ERCOT
Developer
Crane I Solar Electric, LLC
IA Status
IA Executed

Tri-X Solar 1 SLF

ERCOT-20INR0143BetaActiveSolarBatteryERCOTLBNL + Live

201.5 MW hybrid in Crane, TX · In queue since November 2016 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.5 MW

Capacity

1

Components

Solar

10 years

In Queue

IA Executed

IA Phase

Signed Feb 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

5y 3m

IA → COD

6y 8m

Total Duration

5y 3m

Construction75%
Queue EntryNov 7, 2016

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 28, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-10-30

Queue history
20INR0143 · 72 monthly ERCOT reports, Dec 2018 – Sep 2026

Projected COD moved

7 times

Dec 2020 → Oct 2028

Net change

+94 months

first report to latest

Capacity

200 → 202 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 7, 2016
Interconnection agreement signedAug 21, 2026
On ERCOT's inactive listJul 2023 – Apr 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Dec 1, 2027
Differs from queue: Oct 30, 2028From queue filing
Developer in saved assessment
Crane I Solar Electric, LLC
From queue filing
Status at research time
Active
Active — IA executed Feb 2022, FIS pending, project remains in ERCOT queue with confirmed 2027 COD target
Financing
Not recorded

Milestones in this assessment

IA executedFeb 28, 2022

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetDec 1, 2027Latest in this assessment

Target commercial operation date confirmed in ERCOT transmission planning documents

ercot.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. ercot.com/files/docs/2025/10/27/EIR-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project-Status-Update-RPG-Oct-2025.pdf
  2. ercot.com/files/docs/2025/11/10/EIR-Oncor-and-AEPSC-Drill-Hole-to-Sand-Lake-to-Solstice-765-kV-Line-Project-Status-Update-RPG-Nov-2025.pdf
  3. interconnection.fyi/project/ercot-20inr0143
  4. ercotqueue.com/project/20INR0143
  5. cleanview.co/power-projects/planned/solar-farms/texas/20INR0143/tri-x-solar-1-slf

Commercial operation date: Multiple recent ERCOT documents (Oct 2025, Nov 2025) confirm the December 1, 2027 COD matching LBNL's proposed date. No contradictory signals found in search results.

Developer: All sources consistently reference 'Crane I Solar Electric, LLC' as the developer. No parent company or operating entity identified in search results; appears to be a project-specific LLC with no public ownership disclosure.

Status: LBNL shows 'Active' with IA executed. ERCOT documents from Oct/Nov 2025 continue listing the project with 2027 COD. Ercotqueue.com notes 'IA, FIS pending' status, indicating active progression through interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Soda Lake Solar 1 SLF project is a proposed 202.99 MW solar generation project located in Crane County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-20INR0143. The proposed commercial operation date is December 1, 2027.

The project is currently listed as active in the ERCOT queue. Recent news coverage indicates activity surrounding the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Crane

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Crane I Solar Electric, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

138 kV Soda Lake (#76026)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.