Monte Cristo 1 Wind (ERCOT-19INR0054) — Project Summary

Queue ID
ERCOT-19INR0054
Capacity
234.5 MW
Technology
Wind
Status
active
Location
Hidalgo, TX
Region
ERCOT
Developer
Terra-Gen
IA Status
IA Executed

Monte Cristo 1 Wind

ERCOT-19INR0054BetaActiveWindERCOTLBNL

234.5 MW generation in Hidalgo, TX · In queue since April 2017 · Proposed COD November 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

234.5 MW

Capacity

1

Components

Wind

9y 7m

In Queue

IA Executed

IA Phase

Signed May 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

6y 1m

IA → COD

2y 6m

Total Duration

6y 1m

Schedule

12 months past proposed COD

Construction75%
Queue EntryApr 11, 2017

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 9, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2025-11-15

Queue history
19INR0054 · 66 monthly ERCOT reports, Dec 2018 – Apr 2026

Projected COD moved

10 times

Dec 2019 → Feb 2026

Net change

+74 months

first report to latest

Capacity

200 → 235 MW

changed in the reports

Latest stage

Commercial operation

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 11, 2017
Facilities study approvedOct 25, 2024
Interconnection agreement signedMay 9, 2023
Approved for energizationMay 29, 2025
Approved for synchronizationJul 24, 2025
Approved for commercial operationMay 8, 2026
On ERCOT's inactive listOct 2019 – Oct 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 2025
Developer in saved assessment
Terra-Gen
Sources agreed at research time
Status at research time
Online
Online — commissioned November 2025, serving Rio Tinto Kennecott under 15-year VPPA
Financing
Secured
$216 million project cost reported at commissioning (MySA, Nov 16, 2025)
Ownership history
  1. —·Terra-Gen (previous ownership structure)→Terra-Gen (jointly owned by Masdar and Igneo Infrastructure Partners)windtech-international.com

Milestones in this assessment

IA executedMay 9, 2023

Interconnection Agreement executed with ERCOT

interconnection.fyi
COD targetNov 2025

Monte Cristo I commissioned and operational, announced November 13, 2025

businesswire.com
Financing closeNov 2025Latest in this assessment

15-year VPPA with Rio Tinto Kennecott announced concurrent with commissioning, $216M total project investment

mysanantonio.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. windtech-international.com/projects-and-contracts/terra-gen-progresses-texas-wind-expansion-with-monte-cristo-i-commissioning
  2. businesswire.com/news/home/20251113632994/en/Terra-Gen-Expands-Clean-Energy-Portfolio-with-Commissioning-of-Monte-Cristo-I-Windpower-Project-in-Texas
  3. mysanantonio.com/news/south-texas/article/monte-cristo-wind-farm-edinburg-texas-21180024.php
  4. reuters.com/sustainability/climate-energy/rio-tinto-signs-15-year-renewable-power-deal-with-us-based-terragen-2025-11-13/
  5. windinsider.com/2025/11/14/terra-gen-commissions-238-5-mw-monte-cristo-i-windpower-project-in-texas/

Commercial operation date: Multiple independent sources confirm the project commissioned in November 2025 (Business Wire, Windtech International, WindInsider all report commissioning announcements Nov 13-14, 2025). LBNL proposed COD of Feb 2027 was approximately 15 months later than actual.

Developer: LBNL filing entity 'Terra-Gen' matches the operating company name consistently used across all press releases and news coverage. No shell LLC detected.

Status: Multiple sources confirm commissioning completed in November 2025. LBNL status shows 'active' with IA executed, but project has now achieved commercial operation per Business Wire and Windtech International announcements.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Monte Cristo 1 Wind project is a proposed 234.5 MW wind generation project located in Hidalgo County, Texas. Developed by Terra-Gen, the project is interconnected within the ERCOT region under queue ID ERCOT-19INR0054. The project entered the queue on April 11, 2017, and has a proposed commercial operation date of February 27, 2026. An Interconnection Agreement (IA) was executed on May 9, 2023.

The proposed project is linked to the existing Monte Cristo 1 operating plant (EIA ID 67875). Recent news coverage indicates activity related to deals involving the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Hidalgo

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Terra-Gen

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV #8574 Pomelo - #8383 North Edinburg Ckt 2

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MONTECR1_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.