Woodward I repower
— generation in Pecos, TX · In queue since June 2018 · Proposed COD December 2026
—
Capacity
0
Components
8y 4m
In Queue
—
IA Status
Signed Dec 2018
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
6 months
IA → COD
8 years
Total Duration
6 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 18–36 months
Proposed COD: 2026-12-31
The Woodward I repower is a proposed wind development project located in Pecos County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by NextEra, the project involves the repowering of wind generation facilities using wind turbine technology. It is classified as a generation project, and the available data does not specify its total capacity. The project is designed to connect to the grid at the Lynx 138 kV substation (bus 60400).
The project is listed in the ERCOT interconnection queue under the identifier ERCOT-18INR0079, with a queue entry date of June 27, 2018. An interconnection agreement was executed on December 12, 2018, and the project remains in active status. Its proposed commercial operation date is December 31, 2026.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Nextera
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
60400 Lynx 138kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HORSCR_RN
- POI Substation
- Lynx Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Woodward I repowerForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.