Ca-CO-250B
250 MW storage in El Paso, TX · In queue since June 2025 · Proposed COD June 2029
250 MW
Capacity
1
Components
Battery
1y 5m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Queue application filed with EPE for 250 MW battery storage in El Paso County
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of June 2029. No independent news or research sources found to validate or contradict this date.
Developer: LBNL filing shows no developer entity. Project name 'Ca-CO-250B' appears to be a placeholder or internal designation. No press releases, corporate announcements, or ownership records found in search results.
Status: LBNL status shows 'active' with interconnection studies in progress. No news coverage or public announcements found to indicate construction activity, permitting, or financing progress.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Ca-CO-250B is a proposed 250 MW battery energy storage project in El Paso County, Texas, in the western United States. The standalone storage development is listed under queue ID EPE-Q25-LG-6-5 in the interconnection queue administered by El Paso Electric Company (EPE), the utility serving the area. The project's proposed point of interconnection is adjacent to the Caliente 345 kV Substation. It has requested Network Resource Interconnection Service (NRIS).
The project entered the El Paso Electric queue on June 5, 2025, and is being evaluated as part of the utility's 2025 Cluster study. Its queue status is active. The interconnection agreement process is listed as in progress, though the specific study stage has not been identified. The developer has proposed a commercial operation date of June 1, 2029. No developer name, linked operating plant, or news coverage is identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
El Paso
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS
Point of Interconnection
Adjacent to Caliente 345 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Ca-CO-250B
Data-driven briefing on Ca-CO-250B — fleet, generation, financial, and news signals.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.