Va400B
400 MW storage in Dona Ana, NM · In queue since June 2025 · Proposed COD December 2028
400 MW
Capacity
1
Components
Battery
1y 5m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 6m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- epelectric.com/el-paso-electric/uploads/epe-interconnection-queue_active.pdf
- wattstreet.net/county/nm/do-a-ana-cty/
- wattstreet.net/iso/epe/
- interconnection.fyi/projects/state/NM
Commercial operation date: The El Paso Electric active queue PDF lists Va400B with a 12/1/2028 service date, matching LBNL's proposed COD. This is a queue-listed date, not a developer announcement. No news or press release gives an independent COD.
Developer: LBNL developer is null and none of the sources name a developer or parent for Va400B. Aggregator pages only cite EPE as the utility/queue.
Status: The EPE queue PDF (Mar 2026) and aggregators (Watt Street, data as of Oct 2026) list Va400B as active. LBNL's IA status is 'In Progress' with no IA date.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Va400B is a proposed 400 MW battery energy storage development project located in Doña Ana County, New Mexico, in the western United States. The project consists of a single battery storage component with a capacity of 400 MW. It would interconnect to the El Paso Electric Company (EPE) transmission system at the Vado 345 kV Substation, and has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). No developer has been publicly identified in the queue data.
The project entered El Paso Electric's interconnection queue on June 13, 2025, under queue ID EPE-Q25-LG-6-13-6, and is being evaluated as part of the utility's 2025 Cluster study. Its status in the queue is active. The interconnection agreement process is listed as in progress, although the specific study stage has not been reported. Va400B has a proposed commercial operation date of December 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NM
County
Dona Ana
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS/ERIS
Point of Interconnection
Vado 345 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.