Es300B
300 MW storage in Otero, NM · In queue since June 2025 · Proposed COD December 2028
300 MW
Capacity
1
Components
Battery
1y 5m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 6m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-29
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
EPE active queue lists Es300B (300 MW battery, Escondido 115 kV) with a 12/29/2028 in-service date.
epelectric.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- epelectric.com/el-paso-electric/uploads/epe-interconnection-queue_active.pdf
- interconnection.fyi/project/el-paso-electric-q25-lg-6-13-5
- wattstreet.net/county/nm/otero-county/
- infrasure.ai/ask/r/es300b
Commercial operation date: Only queue-derived sources exist. The El Paso Electric active queue PDF lists Es300B with a 12/29/2028 service date, which matches LBNL's proposed COD. No developer press release or news item gives a different target.
Developer: LBNL developer field is null and no search result names a developer or sponsor. The results only show El Paso Electric as the queue/utility, which is not the project developer.
Status: LBNL lists status as active, and the March 2026 EPE active queue PDF and aggregator sites still show it as active. Nothing indicates withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Es300B is a proposed 300 MW battery energy storage development project located in Otero County, New Mexico, in the western United States. The standalone storage project consists of a single battery component rated at 300 MW. It is planned to interconnect at the Escondido 115 kV Substation within the service territory of El Paso Electric Company (EPE), with interconnection requested under both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).
The project entered El Paso Electric's interconnection queue on June 13, 2025, under queue ID EPE-Q25-LG-6-13-5, and is being evaluated as part of the utility's 2025 Cluster study. As of the latest available data, the project holds an active status, and its interconnection agreement process is listed as in progress, with the specific study stage not identified. The proposed commercial operation date is December 29, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NM
County
Otero
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS/ERIS
Point of Interconnection
Escondido 115 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Es300B
Data-driven briefing on Es300B — fleet, generation, financial, and news signals.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.