LD200SB
200 MW hybrid in Luna, NM · In queue since June 2025 · Proposed COD October 2028
200 MW
Capacity
1
Components
Solar
1y 5m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 4m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-10
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Project entered EPE interconnection queue
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of October 2028. No independent news or press releases found to validate or contradict this target date.
Developer: LBNL filing shows no developer information. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.
Status: LBNL queue status shows active with interconnection study in progress. No news coverage or public announcements found to provide additional context on development progress.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
LD200SB is a proposed 200 MW solar-plus-battery hybrid development project in Luna County, New Mexico, in the western United States. The project pairs solar photovoltaic generation with battery energy storage. The interconnection data lists a 200 MW solar component, and no separate capacity is specified for the battery component. The project would interconnect at the Luna-Diablo 345 kV Line, within the service territory of El Paso Electric Company (EPE).
The project is listed in El Paso Electric's interconnection queue under queue ID EPE-Q25-LG-6-13-4. It entered the queue on June 13, 2025, and is being evaluated as part of the 2025 Cluster study. The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its queue status is active, and its interconnection agreement status is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is October 10, 2028. The developer is not identified in the available data.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NM
County
Luna
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS/ERIS
Point of Interconnection
Luna-Diablo 345 kV Line
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about LD200SBForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.