Wi-Al2-199SB
199 MW hybrid in El Paso, TX · In queue since June 2025 · Proposed COD September 2029
199 MW
Capacity
1
Components
Solar
1y 5m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-16
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection application filed with EPE for 199 MW solar+storage project
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of September 2029. No independent news or research sources found to validate or contradict this date.
Developer: LBNL filing shows no developer entity. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.
Status: LBNL status shows active with IA study in progress. Queue date of June 2025 indicates very recent filing with no public development activity yet announced.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Wi-Al2-199SB (queue ID EPE-Q25-LG-6-11-1) is a proposed solar-plus-battery hybrid development project in El Paso County, Texas, in the western region of the United States. The project has a total capacity of 199 MW. The listed component breakdown shows a 199 MW solar component. A battery storage element is identified as part of the technology mix, but no separate capacity is specified for it. The utility associated with the project is El Paso Electric Company, and no developer is identified in the available data.
The project entered the El Paso Electric (EPE) interconnection queue on June 11, 2025, and is part of the 2025 Cluster study phase. Its queue status is active. It proposes to interconnect at the Alamo 115 kV Substation and has requested both Network Resource Interconnection Service and Energy Resource Interconnection Service (NRIS/ERIS). Its interconnection agreement status is listed as in progress, though the specific study stage is not identified. The proposed commercial operation date is September 16, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
El Paso
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS/ERIS
Point of Interconnection
Alamo 115 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.