WMA300SB (EPE-Q25-LG-5-13) — Project Summary

Queue ID
EPE-Q25-LG-5-13
Capacity
300 MW
Technology
Solar+Battery
Status
active
Location
Sierra, NM
Region
West
Developer
—
IA Status
In Progress (unknown study)

WMA300SB

EPE-Q25-LG-5-13BetaActiveSolarBatteryEPELBNL

300 MW hybrid in Sierra, NM · In queue since May 2025 · Proposed COD June 2029

BA: PNMNERC: WECCRC: RCW

300 MW

Capacity

1

Components

Solar

1y 6m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Study Phase

2025 Cluster

In Study38%
Queue EntryMay 13, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the El Paso Electric queue (Q25-LG-5-13). 300 MW solar+battery (250 MW winter) at the West Mesa-Arroyo 345 kV point in Sierra County, NM. IA study in progress, with no public construction or financing activity.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/el-paso-electric-q25-lg-5-13
  2. epelectric.com/el-paso-electric/uploads/epe-interconnection-queue_active.pdf
  3. wattstreet.net/iso/epe/

Commercial operation date: Only queue-derived data exists. The EPE active queue PDF and interconnection.fyi both list 6/1/2029 as the proposed COD, which matches LBNL. No news or press release gives an independent developer target.

Developer: LBNL developer field is null and no search result identifies a developer or parent company. The project name WMA300SB appears to be an EPE queue label rather than a developer name.

Status: LBNL lists the project as active. The EPE active queue PDF (Mar 2026) and the Watt Street and interconnection.fyi pages still show it active. No evidence of withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

WMA300SB (queue ID EPE-Q25-LG-5-13) is a proposed hybrid solar and battery storage development project located in Sierra County, New Mexico, in the western United States. The project has a total capacity of 300 MW. Its solar component accounts for the full 300 MW, and the project also includes a battery storage element whose individual capacity is not specified in the available data. The project would interconnect at the West Mesa-Arroyo 345 kV Line. The developer has not been publicly identified.

The project is in the interconnection queue administered by El Paso Electric Company (EPE), which it entered on May 13, 2025. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated as part of EPE's 2025 Cluster study phase. As of the latest available data, the project's queue status is active. Its interconnection agreement status is listed as in progress, though the specific study stage is unknown. The proposed commercial operation date is June 1, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NM

County

Sierra

Grid Region

Mountain West

Market

—

Developer

—

Utility

El Paso Electric Company

Entity

EPE

Service Type

NRIS

Point of Interconnection

West Mesa-Arroyo 345 kV Line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.