WMA300SB
300 MW hybrid in Sierra, NM · In queue since May 2025 · Proposed COD June 2029
300 MW
Capacity
1
Components
Solar
1y 6m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Study Phase
2025 Cluster
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
medium confidence at research time
- interconnection.fyi/project/el-paso-electric-q25-lg-5-13
- epelectric.com/el-paso-electric/uploads/epe-interconnection-queue_active.pdf
- wattstreet.net/iso/epe/
Commercial operation date: Only queue-derived data exists. The EPE active queue PDF and interconnection.fyi both list 6/1/2029 as the proposed COD, which matches LBNL. No news or press release gives an independent developer target.
Developer: LBNL developer field is null and no search result identifies a developer or parent company. The project name WMA300SB appears to be an EPE queue label rather than a developer name.
Status: LBNL lists the project as active. The EPE active queue PDF (Mar 2026) and the Watt Street and interconnection.fyi pages still show it active. No evidence of withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
WMA300SB (queue ID EPE-Q25-LG-5-13) is a proposed hybrid solar and battery storage development project located in Sierra County, New Mexico, in the western United States. The project has a total capacity of 300 MW. Its solar component accounts for the full 300 MW, and the project also includes a battery storage element whose individual capacity is not specified in the available data. The project would interconnect at the West Mesa-Arroyo 345 kV Line. The developer has not been publicly identified.
The project is in the interconnection queue administered by El Paso Electric Company (EPE), which it entered on May 13, 2025. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated as part of EPE's 2025 Cluster study phase. As of the latest available data, the project's queue status is active. Its interconnection agreement status is listed as in progress, though the specific study stage is unknown. The proposed commercial operation date is June 1, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NM
County
Sierra
Grid Region
Mountain West
Market
—
Developer
—
Utility
El Paso Electric Company
Entity
EPE
Service Type
NRIS
Point of Interconnection
West Mesa-Arroyo 345 kV Line
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.