Project Duke-PP00043 — Project Summary

Queue ID
Duke-PP00043
Capacity
80 MW
Technology
Other
Status
active
Location
Jones, NC
Region
Southeast
Developer
—
IA Status
In Progress (unknown study)

Duke-PP00043

Duke-PP00043BetaActiveOtherDukeLBNL

80 MW generation in Jones, NC · In queue since August 2025 · Proposed COD December 2029

BA: CPLENERC: SERCRC: VACS

80 MW

Capacity

1

Components

Other

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

In Study38%
Queue EntryAug 22, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-13

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-PP00043 is a proposed 80 MW generation project located in Jones County, North Carolina, in the southeastern United States. The project's technology is classified as "Other" in interconnection queue records, with a single 80 MW component of that type. No developer or project name has been publicly identified in the available data. The project is planned to connect to the grid at the Havelock – New Bern 230 kV point of interconnection, within the service territory of Duke Energy Progress.

The development project entered the Duke Energy interconnection queue on August 22, 2025, and currently holds active status. Its proposed commercial operation date is December 13, 2029. The interconnection agreement status is listed as in progress, though the specific study phase has not been identified.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NC

County

Jones

Grid Region

Southeast

Market

—

Developer

—

Utility

Duke Energy Progress

Entity

Duke

Service Type

—

Point of Interconnection

Havelock - New Bern 230

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.