Project Duke-PP00009 — Project Summary

Queue ID
Duke-PP00009
Capacity
74.9 MW
Technology
Solar
Status
active
Location
Darlington, SC
Region
Southeast
Developer
—
IA Status
Construction

Duke-PP00009

Duke-PP00009BetaActiveSolarDukeLBNL

74.9 MW generation in Darlington, SC · In queue since January 2025 · Proposed COD December 2028

BA: DUKNERC: SERCRC: VACS

74.9 MW

Capacity

1

Components

Solar

1y 10m

In Queue

Construction

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 11m

In Study38%
Queue EntryJan 6, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-29

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-PP00009 is a proposed solar generation project located in Darlington County, South Carolina, in the southeastern United States. The development project has a total planned capacity of 74.9 megawatts (MW), consisting entirely of solar photovoltaic generation. It would interconnect to the grid at the Robinson-Florence point of interconnection, within the service territory of Duke Energy Progress. No developer has been publicly identified in the available queue data.

The project entered the Duke Energy interconnection queue on January 6, 2025, and currently holds an active status. Its interconnection agreement status is listed as "Construction," indicating that it has advanced beyond the earlier study phases of the interconnection process. The proposed commercial operation date is December 29, 2028. Because Duke Energy Progress operates outside an organized regional transmission organization, the project is being processed through the utility's own interconnection queue rather than through an independent system operator.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

SC

County

Darlington

Grid Region

Southeast

Market

—

Developer

—

Utility

Duke Energy Progress

Entity

Duke

Service Type

—

Point of Interconnection

Robinson-Florence

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project Duke-PP00009
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.