Duke-FC100386
265 MW generation in Osceola, FL · In queue since December 2025 · Proposed COD December 2030
265 MW
Capacity
1
Components
Gas
11 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5 years
Study Phase
Cluster: 2025 Annual DEF FERC Cluster; Cluster Sub Group: Central
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Queue entry date, interconnection study in progress
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of 2030-12-31. No independent news or research sources to validate or contradict this date.
Developer: LBNL lists Duke Energy Florida, LLC as developer. This is the operating utility subsidiary of Duke Energy Corporation, not a shell LLC. No news sources available to confirm or provide additional context.
Status: LBNL status is 'active' with IA in progress. No news coverage found to provide ground-truth updates on permitting, financing, or construction milestones.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Duke-FC100386 is a proposed 265 MW natural gas generation project in Osceola County, Florida, in the southeastern United States. The project is being developed by Duke Energy Florida, LLC, and would interconnect with the Duke Energy Florida transmission system at the Intercession City 230 kV Substation. The project has requested Network Resource Interconnection Service (NRIS).
The project entered Duke Energy Florida's interconnection queue on December 15, 2025, and holds an active status. It is being studied as part of the 2025 Annual DEF FERC Cluster, within the Central cluster sub-group. Its interconnection agreement status is listed as in progress, though the specific study stage has not been identified. The proposed commercial operation date is December 31, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
FL
County
Osceola
Grid Region
Southeast
Market
—
Developer
Duke Energy Florida, LLC
Utility
Duke Energy Florida
Entity
Duke
Service Type
NRIS
Point of Interconnection
Intercession City 230 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Dori BQ BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Dori BQ Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
What is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
CPG - Duke 6000 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.