Duke-FC100018
74.9 MW generation in Liberty, FL · In queue since December 2024 · Proposed COD June 2028
74.9 MW
Capacity
1
Components
Solar
1y 11m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 6m
Study Phase
Cluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: North
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-30
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Duke-FC100018 is a proposed 74.9 MW solar generation project located in Liberty County, Florida, in the Southeastern United States. The development project is being pursued by Duke Energy Florida, LLC, with Duke Energy Florida serving as the interconnecting utility. The project consists of a single solar component and would connect to the grid at the Atwater - Liberty 115 kV point of interconnection. It has requested Network Resource Interconnection Service (NRIS).
The project entered the Duke Energy Florida interconnection queue on December 13, 2024, and currently holds an active status. It is being evaluated as part of the 2024 Annual DEF FERC Cluster, within the North cluster sub group. As of the latest available data, the project's interconnection agreement status is at the Facility Study stage. The proposed commercial operation date is June 30, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
FL
County
Liberty
Grid Region
Southeast
Market
—
Developer
Duke Energy Florida, LLC
Utility
Duke Energy Florida
Entity
Duke
Service Type
NRIS
Point of Interconnection
Atwater - Liberty 115 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Dori BQ BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Dori BQ Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
What is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
CPG - Duke 6000 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.