Project Duke-FC100004 — Project Summary

Queue ID
Duke-FC100004
Capacity
74.9 MW
Technology
Solar
Status
active
Location
Sumter, FL
Region
Southeast
Developer
Duke Energy Florida, LLC
IA Status
IA Pending

Duke-FC100004

Duke-FC100004BetaActiveSolarDukeLBNL

74.9 MW generation in Sumter, FL · In queue since November 2024 · Proposed COD June 2028

BA: FPLNERC: FRCCRC: FRCC

74.9 MW

Capacity

1

Components

Solar

2 years

In Queue

IA Pending

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 7m

Study Phase

Cluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: Coastal

In Study38%
Queue EntryNov 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-FC100004 is a proposed 74.9 MW solar generation project located in Sumter County, Florida, in the Southeast region of the United States. The development project is being pursued by Duke Energy Florida, LLC, with Duke Energy Florida serving as the interconnecting utility. The project consists of a single solar component with a capacity of 74.9 MW and is planned to connect to the grid at the Central Florida to Holder 230kV point of interconnection.

The project entered the Duke Energy Florida interconnection queue on November 27, 2024, and is currently listed with an active status. It is being evaluated as part of the 2024 Annual DEF FERC Cluster, within the Coastal cluster sub group, and has requested Network Resource Interconnection Service (NRIS). As of the latest available data, the project's interconnection agreement is pending. The proposed commercial operation date is June 30, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

FL

County

Sumter

Grid Region

Southeast

Market

—

Developer

Duke Energy Florida, LLC

Utility

Duke Energy Florida

Entity

Duke

Service Type

NRIS

Point of Interconnection

Central Florida to Holder 230kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.