Project Duke-977302 — Project Summary

Queue ID
Duke-977302
Capacity
99 MW
Technology
Battery
Status
active
Location
York, SC
Region
Southeast
Developer
—
IA Status
Cluster Study

Duke-977302

Duke-977302BetaActiveBatteryDukeLBNL

99 MW storage in York, SC · In queue since June 2025

BA: DUKNERC: SERCRC: VACS

99 MW

Capacity

1

Components

Battery

1y 5m

In Queue

Cluster Study

IA Phase

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 5m

Study Phase

2025 DISIS

Impact Study25%
Queue EntryJun 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-977302 is a proposed battery energy storage development project located in York County, South Carolina, in the southeastern United States. The project has a total planned capacity of 99 MW, consisting entirely of a single battery storage component. It would connect to the transmission system operated by Duke Energy Carolinas at the Huckleberry Wh 100 kV point of interconnection. A developer has not been identified in the available data.

The project entered the Duke Energy Carolinas interconnection queue on June 18, 2025, and its queue status is listed as active. It is being evaluated within the 2025 DISIS (Definitive Interconnection System Impact Study) cluster, and its interconnection agreement status is recorded as "Cluster Study." The project has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). A proposed commercial operation date has not been reported.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

SC

County

York

Grid Region

Southeast

Market

—

Developer

—

Utility

Duke Energy Carolinas

Entity

Duke

Service Type

NRIS/ERIS

Point of Interconnection

Huckleberry Wh 100 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project Duke-977302
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.