Duke-957695
10 MW generation in Wayne, NC · In queue since June 2024
10 MW
Capacity
1
Components
Gas
2y 5m
In Queue
Cluster Study
IA Phase
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 5m
Study Phase
2024 DISIS
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Duke-957695 is a proposed 10 MW gas-fired generation project located in Wayne County, North Carolina. The project is being developed by Duke Energy Progress LLC and is interconnected with Duke Energy Progress. It entered the queue on June 21, 2024, and is currently in the Cluster Study phase of the interconnection process.
The project is listed in the interconnection queue of an ISO/RTO in the Southeast region. The point of interconnection is the Wayne County Plant Substation at 230kV.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NC
County
Wayne
Grid Region
Southeast
Market
—
Developer
Duke Energy Progress LLC
Utility
Duke Energy Progress
Entity
Duke
Service Type
NRIS/ERIS
Point of Interconnection
Wayne County Plant Substation 230kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
What is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
Westminister NC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
CPG - Duke 6000 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
CPG - Duke 5900 Holabird
Data-driven briefing on Duke Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.