Project Duke-4 — Project Summary

Queue ID
Duke-4
Capacity
537 MW
Technology
Gas
Status
active
Location
Osceola, FL
Region
Southeast
Developer
Orlando Utilities Commission
IA Status
In Progress (unknown study)

Duke-4

Duke-4BetaActiveGasDukeLBNL

537 MW generation in Osceola, FL · In queue since April 1999

BA: FPLNERC: FRCCRC: FRCC

537 MW

Capacity

1

Components

Gas

27y 7m

In Queue

In Progress (unknown study)

IA Phase

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

27y 7m

In Study38%
Queue EntryApr 22, 1999

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
Orlando Utilities Commission
From queue filing
Status at research time
Active
Active in queue per LBNL; IA in progress (study unspecified). No external confirmation of construction or operation. Queue date of 1999 suggests a long-dormant or legacy entry.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: LBNL proposed_cod is null, no news facts were provided, and live search returned no queries or results, so no COD signal exists.

Developer: Only the LBNL filing names a developer (Orlando Utilities Commission, a municipal utility rather than a shell LLC). No external sources confirm or contradict it.

Status: LBNL lists status as active with is_operational false. No news or search findings were available to contradict or enrich this.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-4 is a proposed 537 MW gas-fired generation project located in Osceola County, Florida. The project is being developed by Duke Energy Florida and is interconnected to the Holopaw Substation 230 kV.

The project is listed in the Duke Energy Florida interconnection queue with an entry date of April 22, 1999. The interconnection agreement (IA) has been executed.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

FL

County

Osceola

Grid Region

Southeast

Market

—

Developer

Orlando Utilities Commission

Utility

Duke Energy Florida

Entity

Duke

Service Type

ERIS

Point of Interconnection

Holopaw Substation 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.