Project Duke-328 — Project Summary

Queue ID
Duke-328
Capacity
172 MW
Technology
Gas
Status
active
Location
Pinellas, FL
Region
Southeast
Developer
Duke Energy Florida, LLC
IA Status
Construction

Duke-328

Duke-328BetaActiveGasDukeLBNL

172 MW generation in Pinellas, FL · In queue since June 2023 · Proposed COD December 2024

BA: FPLNERC: FRCCRC: FRCC

172 MW

Capacity

1

Components

Gas

3y 5m

In Queue

Construction

IA Phase

COD target: 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 6m

Schedule

23 months past proposed COD

In Study38%
Queue EntryJun 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 30, 2024
From queue filing
Developer in saved assessment
Duke Energy Florida, LLC
From queue filing
Status at research time
Construction
Construction — LBNL indicates active construction status for 172 MW gas facility in Pinellas County
Financing
Not recorded

Milestones in this assessment

IA executedJun 7, 2023Latest in this assessment

Queue entry date, construction status indicates IA likely executed

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2024-12-30. No external sources to validate or contradict this date.

Developer: Duke Energy Florida, LLC is the operating utility entity filing directly, not a shell LLC. No external sources available to confirm or provide additional context.

Status: LBNL queue status shows 'Construction' with active status. No external sources available to provide ground-truth validation of construction progress.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Duke-328 is a proposed 172 MW gas-fired generation project located in Pinellas County, Florida. The project is being developed by Duke Energy Florida, LLC, and is interconnected to the Bartow Plant Substation at 230 kV.

The project is listed in the Duke Energy Florida interconnection queue with an entry date of June 6, 2023. The proposed commercial operation date is November 28, 2023, and the interconnection agreement status is listed as "In Progress (unknown study)".

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

FL

County

Pinellas

Grid Region

Southeast

Market

—

Developer

Duke Energy Florida, LLC

Utility

Duke Energy Florida

Entity

Duke

Service Type

NRIS

Point of Interconnection

Bartow Plant Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.