Project Duke-322 — Project Summary

Queue ID
Duke-322
Capacity
74.9 MW
Technology
Solar
Status
active
Location
Sumter, FL
Region
Southeast
Developer
Duke Energy Florida, LLC
IA Status
Construction

Duke-322

Duke-322BetaActiveSolarDukeLBNL

74.9 MW generation in Sumter, FL · In queue since December 2022 · Proposed COD December 2026

BA: FPLNERC: FRCCRC: FRCC

74.9 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Construction

IA Phase

COD target: 2026

Interconnection

Total Duration

4 years

In Study38%
Queue EntryDec 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-01

About

Duke-322 is a proposed 74.9 MW solar generation project located in Sumter County, Florida. The project, being developed by Duke Energy Florida, LLC, is interconnected to the Duke Energy Florida system at the Crescent Substation 230 kV.

The project is currently active in the Duke Energy interconnection queue, having entered the queue on December 15, 2022, with a proposed commercial operation date of December 1, 2025. The interconnection agreement status is currently listed as "Construction".

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

FL

County

Sumter

Grid Region

Southeast

Market

Developer

Duke Energy Florida, LLC

Utility

Duke Energy Florida

Entity

Duke

Service Type

NRIS/ERIS

Point of Interconnection

Crescent Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.