Duke-290
74.9 MW generation in Suwannee, FL · In queue since December 2020 · Proposed COD October 2025
74.9 MW
Capacity
1
Components
Solar
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2025
Total Duration
4y 10m
Schedule
8 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-31
Duke-290 is a proposed solar generation project with a total capacity of 74.9 MW, located in Suwannee County, Florida. The project is being developed by a masked developer and is interconnected with Duke Energy Florida. It is currently in the Duke Energy Florida interconnection queue with an entry date of December 30, 2020.
The proposed commercial operation date for Duke-290 is October 31, 2023. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Chariot Switching Station 115 kV.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
FL
County
Suwannee
Grid Region
Southeast
Market
—
Developer
Echo River Solar Project, LLC
Utility
Duke Energy Florida
Entity
Duke
Service Type
NRIS/ERIS
Point of Interconnection
Chariot Switching Station
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project Duke-290Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.