Project Dominion-20250929001 — Project Summary

Queue ID
Dominion-20250929001
Capacity
75 MW
Technology
Solar
Status
active
Location
Fairfield, SC
Region
Southeast
Developer
—
IA Status
—

Dominion-20250929001

Dominion-20250929001BetaActiveSolarDominionLBNL

75 MW generation in Fairfield, SC · Proposed COD December 2030

BA: DUKNERC: SERCRC: VACS

75 MW

Capacity

1

Components

Solar

—

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Study Phase

CS25

Pre-Study0%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-31

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Dominion-20250929001 is a proposed 75 MW solar generation project located in Fairfield County, South Carolina, in the southeastern United States. The project consists of a single solar component with a capacity of 75 MW. No project name or developer has been identified in the available data, so the project is referenced by its queue identifier.

The development project is listed as active in the interconnection queue administered by Dominion Energy South Carolina. The queue identifier suggests a queue entry date of September 29, 2025. The project has requested Network Resource Interconnection Service (NRIS) and is proposed to connect at the Winnsboro–Parr 115 kV point of interconnection. It is currently being evaluated in the CS25 study phase, and its proposed commercial operation date is December 31, 2030. The available data does not indicate the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

SC

County

Fairfield

Grid Region

Southeast

Market

—

Developer

—

Utility

Dominion Energy South Carolina

Entity

Dominion

Service Type

NRIS

Point of Interconnection

Winnsboro - Parr 115kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project Dominion-20250929001
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.