Dominion-20250922002
74.9 MW hybrid in Saluda, SC · Proposed COD August 2028
74.9 MW
Capacity
1
Components
Solar
—
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Study Phase
CS25
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-31
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dominion-20250922002 is a proposed hybrid solar and battery storage development project in Saluda County, South Carolina, in the southeastern United States. The project has a total capacity of 74.9 MW. Its listed components include a 74.9 MW solar photovoltaic facility paired with battery storage, though the battery capacity is not specified in the available data. No developer has been publicly identified.
The project is in the interconnection queue of Dominion Energy South Carolina, which operates outside a regional ISO/RTO market. Its status is active, and it is being evaluated in the CS25 study phase. The project has requested Network Resource Interconnection Service (NRIS). Its proposed point of interconnection is the Catalina Solar–Ward 115 kV line. The proposed commercial operation date is August 31, 2028. The available data does not indicate the status of an interconnection agreement.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SC
County
Saluda
Grid Region
Southeast
Market
—
Developer
—
Utility
Dominion Energy South Carolina
Entity
Dominion
Service Type
NRIS
Point of Interconnection
Catalina Solar – Ward 115 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project Dominion-20250922002Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.