Dominion-20240829011
337.5 MW generation in Colleton, SC · Proposed COD December 2029
337.5 MW
Capacity
1
Components
Gas
—
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Study Phase
D24
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only the LBNL snapshot is available, listing a proposed COD of 2029-12-31. No news or live search findings were provided to corroborate or contradict it.
Developer: Only the LBNL filing names the developer (DESC - Generation). No press releases or search results were available to confirm a parent or operating company or any ownership change.
Status: LBNL lists status as active and no other sources contradict it. Ground reality could not be enriched because no news or search data were provided.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dominion-20240829011 is a proposed 337.5 MW gas-fired generation project located in Colleton County, South Carolina. The developer is DESC - Generation, and the interconnecting utility is Dominion Energy South Carolina. This project is in the Dominion queue with an entry date of August 29, 2024, and a proposed commercial operation date of December 31, 2029. The point of interconnection is the Canadys 230kV Substation.
The interconnection agreement for Dominion-20240829011 is currently listed as "In Progress (unknown study)". Recent news coverage indicates industry interest in the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SC
County
Colleton
Grid Region
Southeast
Market
—
Developer
DESC - Generation
Utility
Dominion Energy South Carolina
Entity
Dominion
Service Type
NRIS
Point of Interconnection
Canadys 230kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.