Project Dominion-20211118002 — Project Summary

Queue ID
Dominion-20211118002
Capacity
57.8 MW
Technology
Gas
Status
active
Location
Fairfield, SC
Region
Southeast
Developer
DESC - Generation
IA Status
Cluster Study

Dominion-20211118002

Dominion-20211118002BetaActiveGasDominionLBNL

57.8 MW generation in Fairfield, SC · Proposed COD March 2025

BA: DUKNERC: SERCRC: VACS

57.8 MW

Capacity

1

Components

Gas

—

In Queue

Cluster Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Schedule

21 months past proposed COD

Impact Study25%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-03-10

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Dominion-20211118002 is a proposed natural gas generation project located in Fairfield County, South Carolina, in the southeastern United States. The development project has a total capacity of 57.8 megawatts (MW), consisting of a single gas-fired component. The developer is listed as DESC - Generation, the generation arm of Dominion Energy South Carolina, which is also the interconnecting utility. The project is planned to connect to the grid at the Parr Steam Plant 115 kV Substation.

The project is in the interconnection queue administered by Dominion Energy South Carolina and holds an active status. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). Its interconnection agreement status is listed as "Cluster Study," meaning it is being evaluated alongside other queued projects as part of a group study process. The proposed commercial operation date is March 10, 2025.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

SC

County

Fairfield

Grid Region

Southeast

Market

—

Developer

DESC - Generation

Utility

Dominion Energy South Carolina

Entity

Dominion

Service Type

NRIS/ERIS

Point of Interconnection

Parr Steam Plant 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.