Dominion-20211117001
50 MW generation in Calhoun, SC · Proposed COD December 2022
50 MW
Capacity
1
Components
Gas
—
In Queue
Cluster Study
IA Phase
COD target: 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Schedule
49 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-01
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Dominion-20211117001 is a proposed 50 MW natural gas generation project located in Calhoun County, South Carolina, in the southeastern United States. The development project is listed under DESC - Generation, the generation arm of Dominion Energy South Carolina, which is also the interconnecting utility. The project consists of a single gas-fired component with a capacity of 50 MW. It is proposed to interconnect at the Columbia Energy Center 230 kV Substation and has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS).
The project appears in the interconnection queue administered by Dominion Energy South Carolina rather than an ISO/RTO. Its queue identifier suggests a queue entry date of November 17, 2021. The project's status is active, and its interconnection agreement process is at the Cluster Study stage. The project listed a proposed commercial operation date of December 1, 2022, which has already passed while the project remains in the study phase.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
SC
County
Calhoun
Grid Region
Southeast
Market
—
Developer
DESC - Generation
Utility
Dominion Energy South Carolina
Entity
Dominion
Service Type
NRIS/ERIS
Point of Interconnection
Columbia Energy Center 230 kVSubstation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.