CLPT-CLPT G29
150 MW hybrid in Laramie, WY · In queue since May 2024 · Proposed COD December 2027
150 MW
Capacity
1
Components
Solar
2y 2m
In Queue
Cluster Study
IA Phase
COD target: 2027
Total Duration
3y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
CLPT-CLPT G29 is a proposed 150 MW hybrid solar and battery project located in Laramie County, Wyoming. The development project, consisting of 150 MW of solar capacity, is in the Black Hills Cheyenne Light Fuel and Power Transmission interconnection queue as of May 30, 2024. Its proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the Cluster Study phase.
The project is listed in the interconnection queue under the name of the utility, CLPT, and would connect to the Wallick 115 kV Substation. The project is categorized as a hybrid facility including both solar and battery storage components.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WY
County
Laramie
Grid Region
Mountain West
Market
—
Developer
—
Utility
Black Hills Cheyenne Light Fuel and Power Transmission
Entity
CLPT
Service Type
NRIS
Point of Interconnection
Wallick 115 kV Substation
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project CLPT-CLPT G29Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.