BIG SKY SOLAR
476.02 MW hybrid in Los Angeles, CA · In queue since March 2011 · Proposed COD January 2029
476.02 MW
Capacity
2
Components
Solar + Battery
15y 4m
In Queue
IA Executed
IA Phase
Signed Sep 2014
Queue → IA
3y 6m
IA → COD
14y 4m
Total Duration
3y 6m
Study Phase
C04
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2029-01-01
BIG SKY SOLAR is a proposed 483.4 MW hybrid solar and battery energy storage project located in Los Angeles County, California. The development project consists of a 320 MW solar photovoltaic array coupled with a 163.4 MW battery energy storage system. The project is interconnected to Southern California Edison (SCE) and is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-768, with an original queue entry date of March 31, 2011. The proposed commercial operation date was January 31, 2023.
The project's interconnection agreement (IA) has been executed as of September 10, 2014. The point of interconnection (POI) is the Antelope Substation 230kV bus. The BIG SKY SOLAR project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Antelope Substation 230kV bus
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BIGSK230_2_N022
- POI Substation
- Antelope Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.