FRESNO COGENERATION EXPANSION PROJECT (CAISO-61) — Project Summary

Queue ID
CAISO-61
Capacity
91.769997 MW
Technology
Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
—
IA Status
IA Executed

FRESNO COGENERATION EXPANSION PROJECT

CAISO-61BetaActiveGasBatteryCAISOLBNL + Live

91.77 MW hybrid in Fresno, CA · In queue since March 2005 · Proposed COD February 2023

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

91.77 MW

Capacity

2

Components

Gas + Battery

21y 8m

In Queue

IA Executed

IA Phase

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

17y 11m

Schedule

45 months past proposed COD

Construction75%
Queue EntryMar 30, 2005

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; AMEND 39

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2023-02-28

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Fresno Cogeneration Expansion Project is a proposed hybrid development project located in Fresno County, California, with a total capacity of 91.77 MW. The project, which combines 73.27 MW of gas generation with an 18.5 MW battery component, is interconnected to the PG&E utility via the Helm-Kerman 70 kV Line.

The project is listed in the CAISO interconnection queue as queue ID CAISO-61, with an initial queue entry date of March 30, 2005, and a proposed commercial operation date of February 28, 2023. An Interconnection Agreement (IA) for the project was executed on July 31, 2023. The project currently has an active status in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Helm-Kerman 70 kV Line

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Gas73.27 MW · 80%
Battery18.5 MW · 20%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.