Stuart Mesa Solar (CAISO-54852) — Project Summary

Queue ID
CAISO-54852
Capacity
56 MW
Technology
Solar
Status
active
Location
San Diego, CA
Region
CAISO
Developer
IA Status
Not Started

Stuart Mesa Solar

CAISO-54852BetaActiveSolarCAISOLBNL

56 MW generation in San Diego, CA · In queue since April 2023 · Proposed COD July 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

56 MW

Capacity

1

Components

Solar

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 3m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

Risk Analytics

Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability
Counterparty exposure
About

The Stuart Mesa Solar project is a proposed 56 MW solar generation project located in San Diego County, California. The project is in the CAISO interconnection queue as entry CAISO-54852, with a queue entry date of April 17, 2023. The proposed commercial operation date is July 1, 2028.

The project's interconnection agreement (IA) status is listed as "Not Started." The designated point of interconnection (POI) is 697 (Oceanside - San Luis Rey), and the interconnecting utility is SDGE. The project is currently listed as "active" in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Diego

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

697 (Oceanside - San Luis Rey)

Data Source

LBNL

Generation Forecast

Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year horizon (through 2034)
P10 / P50 / P90 confidence bands
Weather + policy + demand scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SANLUSRY_6_N013
POI Substation
San Luis 5

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Stuart Mesa Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.