Maravillosa Solar 2
811.997 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD June 2029
811.997 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Maravillosa Solar 2 is a proposed 812.0 MW hybrid solar and battery project located in Kern County, California. The development project consists of a 407.34 MW solar component and a 404.66 MW battery energy storage system. It is interconnected to the CAISO grid under queue ID CAISO-54625, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 30, 2029. The point of interconnection is the GATES-MIDWAY 500kV substation.
The project's interconnection agreement status is listed as "Not Started". The proposed project is located within the CAISO region and will connect to the PG&E utility service territory. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
GATES-MIDWAY 500kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.