Green Palms (CAISO-2368) — Project Summary

Queue ID
CAISO-2368
Capacity
306.7 MW
Technology
Solar
Status
active
Location
Riverside, CA
Region
CAISO
Developer
—
IA Status
Not Started

Green Palms

CAISO-2368BetaActiveSolarCAISOLBNL

306.7 MW generation in Riverside, CA · In queue since April 2023 · Proposed COD December 2030

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

306.7 MW

Capacity

1

Components

Solar

3y 7m

In Queue

Not Started

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 8m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2030
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (queued 2023-04-17); interconnection agreement not started and no public sign of construction or permitting.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/california/54832_photovoltaic/green-palms

Commercial operation date: Only the LBNL filing (proposed COD 2030-12-31) gives a date for this project. The Cleanview listing (expected December 2030) matches it but appears to be derived from the same queue data, so it is not an independent post-LBNL signal.

Developer: The LBNL developer field is null, and no search result names a developer or parent company for Green Palms. Other results are unrelated businesses or articles.

Status: LBNL lists the project as active with IA status Not Started. Cleanview lists it as a planned solar farm, which is consistent, and nothing contradicts it.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Green Palms is a proposed 306.7 MW solar generation project located in Riverside County, California. The development project is listed in the interconnection queue of the California Independent System Operator (CAISO) under queue ID CAISO-2368, within the service territory of Southern California Edison (SCE). The developer of the project has not been publicly identified in the available queue data. The project is planned to interconnect at the Colorado River 230 kV point of interconnection and has requested Energy Resource Interconnection Service (ERIS).

The project entered the CAISO queue on April 17, 2023, and is being evaluated as part of Cluster 15. Its queue status is currently active, with a proposed commercial operation date of December 31, 2030. As of the latest available data, the interconnection agreement (IA) process for Green Palms has not been started.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

COLORADO RIVER 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CRIMSN_7_CN3
POI Substation
Colorado River Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.